{"title":"世界上第一个大口径三套管出口","authors":"V. Sánchez","doi":"10.3997/2214-4609.201900364","DOIUrl":null,"url":null,"abstract":"Summary In order to achieve the objective for drilling a new section in the well and due to the current scenario , the only alternative was to open a side-track through three casings sizes 11 7/8 “71 lb/ft – 13 3/8 “72 lb/ft - 16” 109 lb/ft, which represented a great challenge for both companies. With these challenges on the table and without worldwide records of jobs alike this operation, the possible risks that could arise during the mill out of these three casing were evaluated. The success of the operation was implicit in the planning and both companies knew it. That being said, the customer and BHGE broke boundaries by planning and succeeding in this outstanding operation","PeriodicalId":335882,"journal":{"name":"Second EAGE Workshop on Deepwater Exploration in Mexico: Knowledge transfer and collaboration from shelf to deepwater","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-04-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"World's First Bigbore Triple Casing Exit\",\"authors\":\"V. Sánchez\",\"doi\":\"10.3997/2214-4609.201900364\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Summary In order to achieve the objective for drilling a new section in the well and due to the current scenario , the only alternative was to open a side-track through three casings sizes 11 7/8 “71 lb/ft – 13 3/8 “72 lb/ft - 16” 109 lb/ft, which represented a great challenge for both companies. With these challenges on the table and without worldwide records of jobs alike this operation, the possible risks that could arise during the mill out of these three casing were evaluated. The success of the operation was implicit in the planning and both companies knew it. That being said, the customer and BHGE broke boundaries by planning and succeeding in this outstanding operation\",\"PeriodicalId\":335882,\"journal\":{\"name\":\"Second EAGE Workshop on Deepwater Exploration in Mexico: Knowledge transfer and collaboration from shelf to deepwater\",\"volume\":\"23 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Second EAGE Workshop on Deepwater Exploration in Mexico: Knowledge transfer and collaboration from shelf to deepwater\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3997/2214-4609.201900364\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Second EAGE Workshop on Deepwater Exploration in Mexico: Knowledge transfer and collaboration from shelf to deepwater","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3997/2214-4609.201900364","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Summary In order to achieve the objective for drilling a new section in the well and due to the current scenario , the only alternative was to open a side-track through three casings sizes 11 7/8 “71 lb/ft – 13 3/8 “72 lb/ft - 16” 109 lb/ft, which represented a great challenge for both companies. With these challenges on the table and without worldwide records of jobs alike this operation, the possible risks that could arise during the mill out of these three casing were evaluated. The success of the operation was implicit in the planning and both companies knew it. That being said, the customer and BHGE broke boundaries by planning and succeeding in this outstanding operation