世界上第一个大口径三套管出口

V. Sánchez
{"title":"世界上第一个大口径三套管出口","authors":"V. Sánchez","doi":"10.3997/2214-4609.201900364","DOIUrl":null,"url":null,"abstract":"Summary In order to achieve the objective for drilling a new section in the well and due to the current scenario , the only alternative was to open a side-track through three casings sizes 11 7/8 “71 lb/ft – 13 3/8 “72 lb/ft - 16” 109 lb/ft, which represented a great challenge for both companies. With these challenges on the table and without worldwide records of jobs alike this operation, the possible risks that could arise during the mill out of these three casing were evaluated. The success of the operation was implicit in the planning and both companies knew it. That being said, the customer and BHGE broke boundaries by planning and succeeding in this outstanding operation","PeriodicalId":335882,"journal":{"name":"Second EAGE Workshop on Deepwater Exploration in Mexico: Knowledge transfer and collaboration from shelf to deepwater","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-04-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"World's First Bigbore Triple Casing Exit\",\"authors\":\"V. Sánchez\",\"doi\":\"10.3997/2214-4609.201900364\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Summary In order to achieve the objective for drilling a new section in the well and due to the current scenario , the only alternative was to open a side-track through three casings sizes 11 7/8 “71 lb/ft – 13 3/8 “72 lb/ft - 16” 109 lb/ft, which represented a great challenge for both companies. With these challenges on the table and without worldwide records of jobs alike this operation, the possible risks that could arise during the mill out of these three casing were evaluated. The success of the operation was implicit in the planning and both companies knew it. That being said, the customer and BHGE broke boundaries by planning and succeeding in this outstanding operation\",\"PeriodicalId\":335882,\"journal\":{\"name\":\"Second EAGE Workshop on Deepwater Exploration in Mexico: Knowledge transfer and collaboration from shelf to deepwater\",\"volume\":\"23 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Second EAGE Workshop on Deepwater Exploration in Mexico: Knowledge transfer and collaboration from shelf to deepwater\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3997/2214-4609.201900364\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Second EAGE Workshop on Deepwater Exploration in Mexico: Knowledge transfer and collaboration from shelf to deepwater","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3997/2214-4609.201900364","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

为了实现在井中钻新井段的目标,考虑到目前的情况,唯一的选择是通过3种尺寸为11 7/8”71 lb/ft - 13 3/8”72 lb/ft - 16”109 lb/ft的套管打开侧轨,这对两家公司来说都是一个巨大的挑战。面对这些挑战,在没有类似作业的全球记录的情况下,对这三种套管在磨铣过程中可能出现的风险进行了评估。这次行动的成功是在计划中暗含的,两家公司都知道这一点。话虽如此,客户和BHGE通过计划并成功完成了这次出色的作业,打破了界限
本文章由计算机程序翻译,如有差异,请以英文原文为准。
World's First Bigbore Triple Casing Exit
Summary In order to achieve the objective for drilling a new section in the well and due to the current scenario , the only alternative was to open a side-track through three casings sizes 11 7/8 “71 lb/ft – 13 3/8 “72 lb/ft - 16” 109 lb/ft, which represented a great challenge for both companies. With these challenges on the table and without worldwide records of jobs alike this operation, the possible risks that could arise during the mill out of these three casing were evaluated. The success of the operation was implicit in the planning and both companies knew it. That being said, the customer and BHGE broke boundaries by planning and succeeding in this outstanding operation
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信