{"title":"制药行业过程控制系统的验证","authors":"V. Teuchert","doi":"10.23919/ecc.1999.7100099","DOIUrl":null,"url":null,"abstract":"Process control systems for pharmaceutical production plants have to be designed, installed and commissioned in accordance with specific quality assurance measures to ensure high operational safety and compliance with regulatory requirements. These measures must be documented carefully as the results will be presented to regulatory authorities upon inspection as proof of compliance. The overall process is called validation and the subset of measures relevant for technical systems is called qualification. This paper presents a concept for prospective qualification of process control systems based on the integration of qualification measures into the control system design, installation and commissioning process.","PeriodicalId":117668,"journal":{"name":"1999 European Control Conference (ECC)","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Validation of process control systems in the pharmaceutical industry\",\"authors\":\"V. Teuchert\",\"doi\":\"10.23919/ecc.1999.7100099\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Process control systems for pharmaceutical production plants have to be designed, installed and commissioned in accordance with specific quality assurance measures to ensure high operational safety and compliance with regulatory requirements. These measures must be documented carefully as the results will be presented to regulatory authorities upon inspection as proof of compliance. The overall process is called validation and the subset of measures relevant for technical systems is called qualification. This paper presents a concept for prospective qualification of process control systems based on the integration of qualification measures into the control system design, installation and commissioning process.\",\"PeriodicalId\":117668,\"journal\":{\"name\":\"1999 European Control Conference (ECC)\",\"volume\":\"4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1999-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"1999 European Control Conference (ECC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.23919/ecc.1999.7100099\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"1999 European Control Conference (ECC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23919/ecc.1999.7100099","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

制药生产工厂的过程控制系统必须按照特定的质量保证措施进行设计、安装和调试,以确保高度的操作安全性并符合法规要求。这些措施必须仔细记录,因为结果将在检查后提交给监管机构作为合规证明。整个过程称为验证,与技术系统相关的度量子集称为鉴定。本文提出了在控制系统设计、安装和调试过程中,将验证措施整合到过程控制系统的前瞻性验证的概念。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Validation of process control systems in the pharmaceutical industry
Process control systems for pharmaceutical production plants have to be designed, installed and commissioned in accordance with specific quality assurance measures to ensure high operational safety and compliance with regulatory requirements. These measures must be documented carefully as the results will be presented to regulatory authorities upon inspection as proof of compliance. The overall process is called validation and the subset of measures relevant for technical systems is called qualification. This paper presents a concept for prospective qualification of process control systems based on the integration of qualification measures into the control system design, installation and commissioning process.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信