{"title":"实现可靠发电机100%定子接地故障保护","authors":"N. Safari-Shad, Russ Franklin","doi":"10.1109/CPRE48231.2021.9429850","DOIUrl":null,"url":null,"abstract":"The purpose of this paper is to present setting and commissioning guidelines to achieve reliable (i.e., dependable and secure) generator 100% stator ground fault protection for large high-impedance grounded generators. Using these guidelines, a recent generator relay upgrade project is used as an example of the setting calculations where a reliable generator 100% stator ground fault protection is attained.","PeriodicalId":405115,"journal":{"name":"2021 74th Conference for Protective Relay Engineers (CPRE)","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-03-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Achieving Reliable Generator 100% Stator Ground Fault Protection\",\"authors\":\"N. Safari-Shad, Russ Franklin\",\"doi\":\"10.1109/CPRE48231.2021.9429850\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The purpose of this paper is to present setting and commissioning guidelines to achieve reliable (i.e., dependable and secure) generator 100% stator ground fault protection for large high-impedance grounded generators. Using these guidelines, a recent generator relay upgrade project is used as an example of the setting calculations where a reliable generator 100% stator ground fault protection is attained.\",\"PeriodicalId\":405115,\"journal\":{\"name\":\"2021 74th Conference for Protective Relay Engineers (CPRE)\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-03-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 74th Conference for Protective Relay Engineers (CPRE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CPRE48231.2021.9429850\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 74th Conference for Protective Relay Engineers (CPRE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CPRE48231.2021.9429850","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The purpose of this paper is to present setting and commissioning guidelines to achieve reliable (i.e., dependable and secure) generator 100% stator ground fault protection for large high-impedance grounded generators. Using these guidelines, a recent generator relay upgrade project is used as an example of the setting calculations where a reliable generator 100% stator ground fault protection is attained.