考虑维修周期的带配电网技术损耗估计

Abd-El Fattah S. Hammad, Hossam A. Abd el-Ghany, A. Azmy
{"title":"考虑维修周期的带配电网技术损耗估计","authors":"Abd-El Fattah S. Hammad, Hossam A. Abd el-Ghany, A. Azmy","doi":"10.1109/MEPCON55441.2022.10021817","DOIUrl":null,"url":null,"abstract":"This paper investigates the effect of fault repairing periods on the estimation process of technical energy losses (TELs) in distribution networks with tie-switches. Comparisons between TELs calculations considering normal operation periods (NOP) only and those considering both NOP and repairing faults periods (RFP) are presented. Different repairing times (RTs) are assumed to highlight the impact of maintenance and /or repairing time on the estimation process with a wide range of fault cases. The IEEE 33-bus system with tie-switches is chosen as the test system in this paper. Load flow analysis (LF) of the case studies is implemented by ETAP program. Results are given for distribution networks with tie-switches including radial and ring schemes regarding the effect of different repairing and or maintenance time. The results assure the importance of utilizing tie switches to reduce the effect of faults repairing time on the estimation process of TELs.","PeriodicalId":174878,"journal":{"name":"2022 23rd International Middle East Power Systems Conference (MEPCON)","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Estimation of Technical Losses in Distribution Networks with Tie Switches Considering Repairing Periods\",\"authors\":\"Abd-El Fattah S. Hammad, Hossam A. Abd el-Ghany, A. Azmy\",\"doi\":\"10.1109/MEPCON55441.2022.10021817\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper investigates the effect of fault repairing periods on the estimation process of technical energy losses (TELs) in distribution networks with tie-switches. Comparisons between TELs calculations considering normal operation periods (NOP) only and those considering both NOP and repairing faults periods (RFP) are presented. Different repairing times (RTs) are assumed to highlight the impact of maintenance and /or repairing time on the estimation process with a wide range of fault cases. The IEEE 33-bus system with tie-switches is chosen as the test system in this paper. Load flow analysis (LF) of the case studies is implemented by ETAP program. Results are given for distribution networks with tie-switches including radial and ring schemes regarding the effect of different repairing and or maintenance time. The results assure the importance of utilizing tie switches to reduce the effect of faults repairing time on the estimation process of TELs.\",\"PeriodicalId\":174878,\"journal\":{\"name\":\"2022 23rd International Middle East Power Systems Conference (MEPCON)\",\"volume\":\"13 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 23rd International Middle East Power Systems Conference (MEPCON)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/MEPCON55441.2022.10021817\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 23rd International Middle East Power Systems Conference (MEPCON)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MEPCON55441.2022.10021817","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文研究了故障修复周期对配电网技术能损估算过程的影响。比较了仅考虑正常运行周期(NOP)和同时考虑正常运行周期(NOP)和故障修复周期(RFP)的TELs计算结果。假设不同的维修时间(RTs),以突出维护和/或维修时间对各种故障情况下估计过程的影响。本文选用IEEE 33总线系接开关系统作为测试系统。应用ETAP程序对案例进行潮流分析。给出了配电网配线开关的径向和环形两种方案的检修时间对配线开关检修时间的影响。结果表明,利用联系开关减少故障修复时间对tel估计过程的影响是非常重要的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Estimation of Technical Losses in Distribution Networks with Tie Switches Considering Repairing Periods
This paper investigates the effect of fault repairing periods on the estimation process of technical energy losses (TELs) in distribution networks with tie-switches. Comparisons between TELs calculations considering normal operation periods (NOP) only and those considering both NOP and repairing faults periods (RFP) are presented. Different repairing times (RTs) are assumed to highlight the impact of maintenance and /or repairing time on the estimation process with a wide range of fault cases. The IEEE 33-bus system with tie-switches is chosen as the test system in this paper. Load flow analysis (LF) of the case studies is implemented by ETAP program. Results are given for distribution networks with tie-switches including radial and ring schemes regarding the effect of different repairing and or maintenance time. The results assure the importance of utilizing tie switches to reduce the effect of faults repairing time on the estimation process of TELs.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信