面向钻井优化的阿奇莫夫矿床综合分析方法

A. Gilmiyanova, Rf Ufa RN-BashNIPIneft Llc, G. A. Khamidullina, E. D. Suleimanov, A. A. Mironenko, M. V. Sukhova, Rf Tyumen Kharampurneftegas Llc
{"title":"面向钻井优化的阿奇莫夫矿床综合分析方法","authors":"A. Gilmiyanova, Rf Ufa RN-BashNIPIneft Llc, G. A. Khamidullina, E. D. Suleimanov, A. A. Mironenko, M. V. Sukhova, Rf Tyumen Kharampurneftegas Llc","doi":"10.24887/0028-2448-2019-9-20-23","DOIUrl":null,"url":null,"abstract":"\n This paper presents the results of an integrated approach to the analysis of the geological structure and the subsequent of the productive Achimov deposits development: deposits X and Y located in Western Siberia. The main difficulties in the development of the Achimov deposits are associated with a high heterogeneity, a low degree of prediction of effective thicknesses, the difficulty of correctly calculating well flow rates, saturation behavior and, accordingly, water cut, and high production decline rates identified as a result of putting new wells into operation.","PeriodicalId":359083,"journal":{"name":"Day 2 Tue, October 27, 2020","volume":"457 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Integrated Approach to the Analysis of Achimov Deposits for the Purpose of Optimizing Drilling\",\"authors\":\"A. Gilmiyanova, Rf Ufa RN-BashNIPIneft Llc, G. A. Khamidullina, E. D. Suleimanov, A. A. Mironenko, M. V. Sukhova, Rf Tyumen Kharampurneftegas Llc\",\"doi\":\"10.24887/0028-2448-2019-9-20-23\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n This paper presents the results of an integrated approach to the analysis of the geological structure and the subsequent of the productive Achimov deposits development: deposits X and Y located in Western Siberia. The main difficulties in the development of the Achimov deposits are associated with a high heterogeneity, a low degree of prediction of effective thicknesses, the difficulty of correctly calculating well flow rates, saturation behavior and, accordingly, water cut, and high production decline rates identified as a result of putting new wells into operation.\",\"PeriodicalId\":359083,\"journal\":{\"name\":\"Day 2 Tue, October 27, 2020\",\"volume\":\"457 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-10-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, October 27, 2020\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24887/0028-2448-2019-9-20-23\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, October 27, 2020","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24887/0028-2448-2019-9-20-23","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

本文介绍了一种综合方法对位于西伯利亚西部的阿奇莫夫多产矿床X和Y的地质构造和后续发展进行分析的结果。Achimov矿床开发的主要困难是非均质性高,有效厚度预测程度低,难以正确计算井流量、饱和度和相应的含水率,以及新井投产后发现的高产量递减率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Integrated Approach to the Analysis of Achimov Deposits for the Purpose of Optimizing Drilling
This paper presents the results of an integrated approach to the analysis of the geological structure and the subsequent of the productive Achimov deposits development: deposits X and Y located in Western Siberia. The main difficulties in the development of the Achimov deposits are associated with a high heterogeneity, a low degree of prediction of effective thicknesses, the difficulty of correctly calculating well flow rates, saturation behavior and, accordingly, water cut, and high production decline rates identified as a result of putting new wells into operation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信