世界一流的通用航空供应链可靠性

M. Hamada, G. Jarrell
{"title":"世界一流的通用航空供应链可靠性","authors":"M. Hamada, G. Jarrell","doi":"10.1109/RAMS.2008.4925766","DOIUrl":null,"url":null,"abstract":"The overall objective of design for reliability is to ensure that the final product will be economically reliable. This means that the product's observed reliability has been established with consideration of life cycle costs. These costs include the acquisition cost, scheduled maintenance cost, unscheduled maintenance cost and the cost of failures. Cessna Aircraft Company has developed a model that is used to track the performance of each component, not only based on historical field history, but based on what matters most to the customers, the life cycle cost. This very simple model enables the design and procurement teams to evaluate options, prioritize resources and provides feedback very quickly to the design team during the design process as to which issues need to be addressed first.","PeriodicalId":143940,"journal":{"name":"2008 Annual Reliability and Maintainability Symposium","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2008-01-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"World-class supply chain reliability in general aviation\",\"authors\":\"M. Hamada, G. Jarrell\",\"doi\":\"10.1109/RAMS.2008.4925766\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The overall objective of design for reliability is to ensure that the final product will be economically reliable. This means that the product's observed reliability has been established with consideration of life cycle costs. These costs include the acquisition cost, scheduled maintenance cost, unscheduled maintenance cost and the cost of failures. Cessna Aircraft Company has developed a model that is used to track the performance of each component, not only based on historical field history, but based on what matters most to the customers, the life cycle cost. This very simple model enables the design and procurement teams to evaluate options, prioritize resources and provides feedback very quickly to the design team during the design process as to which issues need to be addressed first.\",\"PeriodicalId\":143940,\"journal\":{\"name\":\"2008 Annual Reliability and Maintainability Symposium\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-01-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 Annual Reliability and Maintainability Symposium\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/RAMS.2008.4925766\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 Annual Reliability and Maintainability Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RAMS.2008.4925766","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

可靠性设计的总体目标是确保最终产品在经济上是可靠的。这意味着产品观察到的可靠性已经建立在考虑生命周期成本的基础上。这些成本包括购置成本、计划维护成本、计划外维护成本和故障成本。塞斯纳飞机公司开发了一种模型,用于跟踪每个部件的性能,不仅基于历史现场历史,而且基于对客户最重要的东西,生命周期成本。这个非常简单的模型使设计和采购团队能够评估选项,确定资源的优先级,并在设计过程中非常迅速地向设计团队提供需要首先解决哪些问题的反馈。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
World-class supply chain reliability in general aviation
The overall objective of design for reliability is to ensure that the final product will be economically reliable. This means that the product's observed reliability has been established with consideration of life cycle costs. These costs include the acquisition cost, scheduled maintenance cost, unscheduled maintenance cost and the cost of failures. Cessna Aircraft Company has developed a model that is used to track the performance of each component, not only based on historical field history, but based on what matters most to the customers, the life cycle cost. This very simple model enables the design and procurement teams to evaluate options, prioritize resources and provides feedback very quickly to the design team during the design process as to which issues need to be addressed first.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信