{"title":"使用gozinto -list方法分解物料清单","authors":"C. Glock, Hamid Abedinnia","doi":"10.1504/ijiome.2015.073163","DOIUrl":null,"url":null,"abstract":"This paper introduces a method for calculating material requirements by decomposing bills of materials. Starting with the primary (end customer) demand, we use bills of materials to calculate direct material requirements step by step for each production stage until the total material requirements have been calculated. The method proposed in this paper illustrates how the product structure influences material requirements and may thus be used in class to show students how material requirements can be calculated precisely. In addition, the method proposed in this paper may also be applied for calculating material requirements in practice.","PeriodicalId":193538,"journal":{"name":"International Journal of Information and Operations Management Education","volume":"211 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Decomposing bills of materials using the Gozinto-list-method\",\"authors\":\"C. Glock, Hamid Abedinnia\",\"doi\":\"10.1504/ijiome.2015.073163\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper introduces a method for calculating material requirements by decomposing bills of materials. Starting with the primary (end customer) demand, we use bills of materials to calculate direct material requirements step by step for each production stage until the total material requirements have been calculated. The method proposed in this paper illustrates how the product structure influences material requirements and may thus be used in class to show students how material requirements can be calculated precisely. In addition, the method proposed in this paper may also be applied for calculating material requirements in practice.\",\"PeriodicalId\":193538,\"journal\":{\"name\":\"International Journal of Information and Operations Management Education\",\"volume\":\"211 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-11-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Information and Operations Management Education\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/ijiome.2015.073163\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Information and Operations Management Education","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/ijiome.2015.073163","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Decomposing bills of materials using the Gozinto-list-method
This paper introduces a method for calculating material requirements by decomposing bills of materials. Starting with the primary (end customer) demand, we use bills of materials to calculate direct material requirements step by step for each production stage until the total material requirements have been calculated. The method proposed in this paper illustrates how the product structure influences material requirements and may thus be used in class to show students how material requirements can be calculated precisely. In addition, the method proposed in this paper may also be applied for calculating material requirements in practice.