方法方法预测法(PDM)优化公寓项目建设

Arizal Nurhidayat, Basuki Arianto, W. Bhirawa
{"title":"方法方法预测法(PDM)优化公寓项目建设","authors":"Arizal Nurhidayat, Basuki Arianto, W. Bhirawa","doi":"10.35968/JTIN.V10I1.706","DOIUrl":null,"url":null,"abstract":"PT JG Tbk which is engaged in building construction. This company was founded in 1980, although it has been around for decades, and has experienced various types of building construction models. Companies often experience work delays at the time of implementation, because the delay in project work is not carried out right at the time of the agreement. Therefore, it is necessary to analyze the project scheduling so that it can be seen how long the project can be completed. The stages at the completion of the SGC project on floors 3 to 5, namely: determining the stages of activities, compiling new networks, making precedence diagram method activities, estimating manpower costs. In the case of the construction of the SGC Cibubur apartment floors 3 to 5 floors. With scheduling data from the company, which is for 497 days, the wages of masons, workers and foremen are Rp. 5,886,132,300.00 with the calculation of wages for mason workers, kenek and foremen using the PDM method of Rp. 5,401,080,000.00 savings in labor wages to Rp. 485,052,300.00 from the results of calculations using the PDM method is far more optimal than the calculations used by the company. Keywords: Project, Critical Path, Networking Diagram, Precedence Diagram Method (PDM)","PeriodicalId":322142,"journal":{"name":"Jurnal TeknikIndustri","volume":"18 2","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-04-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"OPTIMALISASI PEMBANGUNAN PROYEK APARTEMEN SGC CIBUBUR DENGAN MENGGUNAKAN METODE PRECEDENCE DIAGRAM METHOD (PDM)\",\"authors\":\"Arizal Nurhidayat, Basuki Arianto, W. Bhirawa\",\"doi\":\"10.35968/JTIN.V10I1.706\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PT JG Tbk which is engaged in building construction. This company was founded in 1980, although it has been around for decades, and has experienced various types of building construction models. Companies often experience work delays at the time of implementation, because the delay in project work is not carried out right at the time of the agreement. Therefore, it is necessary to analyze the project scheduling so that it can be seen how long the project can be completed. The stages at the completion of the SGC project on floors 3 to 5, namely: determining the stages of activities, compiling new networks, making precedence diagram method activities, estimating manpower costs. In the case of the construction of the SGC Cibubur apartment floors 3 to 5 floors. With scheduling data from the company, which is for 497 days, the wages of masons, workers and foremen are Rp. 5,886,132,300.00 with the calculation of wages for mason workers, kenek and foremen using the PDM method of Rp. 5,401,080,000.00 savings in labor wages to Rp. 485,052,300.00 from the results of calculations using the PDM method is far more optimal than the calculations used by the company. Keywords: Project, Critical Path, Networking Diagram, Precedence Diagram Method (PDM)\",\"PeriodicalId\":322142,\"journal\":{\"name\":\"Jurnal TeknikIndustri\",\"volume\":\"18 2\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-04-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal TeknikIndustri\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.35968/JTIN.V10I1.706\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal TeknikIndustri","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35968/JTIN.V10I1.706","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

PT jgtbk是一家从事建筑施工的公司。该公司成立于1980年,虽然已经存在了几十年,并经历了各种类型的建筑施工模式。公司经常在执行时遇到工作延误,因为项目工作的延误没有在协议的时候进行。因此,有必要对项目进度进行分析,以便可以看到项目可以完成多长时间。3至5层SGC项目完成的阶段,即:确定活动阶段,编制新网络,制作优先图方法活动,估算人力成本。在建造SGC Cibubur公寓的情况下,楼层为3至5层。根据公司497天的调度数据,泥瓦匠、工人和领班的工资为5,886,132,300.00卢比,使用PDM法计算泥瓦匠、kenek和领班的工资为5,401,080,000.00卢比,使用PDM法计算的结果将劳动工资节省到4,85,052,300.00卢比,远远优于公司使用的计算方法。关键路径,网络图,优先图法(PDM)
本文章由计算机程序翻译,如有差异,请以英文原文为准。
OPTIMALISASI PEMBANGUNAN PROYEK APARTEMEN SGC CIBUBUR DENGAN MENGGUNAKAN METODE PRECEDENCE DIAGRAM METHOD (PDM)
PT JG Tbk which is engaged in building construction. This company was founded in 1980, although it has been around for decades, and has experienced various types of building construction models. Companies often experience work delays at the time of implementation, because the delay in project work is not carried out right at the time of the agreement. Therefore, it is necessary to analyze the project scheduling so that it can be seen how long the project can be completed. The stages at the completion of the SGC project on floors 3 to 5, namely: determining the stages of activities, compiling new networks, making precedence diagram method activities, estimating manpower costs. In the case of the construction of the SGC Cibubur apartment floors 3 to 5 floors. With scheduling data from the company, which is for 497 days, the wages of masons, workers and foremen are Rp. 5,886,132,300.00 with the calculation of wages for mason workers, kenek and foremen using the PDM method of Rp. 5,401,080,000.00 savings in labor wages to Rp. 485,052,300.00 from the results of calculations using the PDM method is far more optimal than the calculations used by the company. Keywords: Project, Critical Path, Networking Diagram, Precedence Diagram Method (PDM)
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信