{"title":"结构化设计有利于过程控制软件项目","authors":"G. Benincasa, A. Daneels, P. Heymans, C. Serre","doi":"10.1145/800218.806638","DOIUrl":null,"url":null,"abstract":"A 12-man-year process control software project has been successfully completed in 12 months without interruption of the production process of CERN PS accelerators. After 6 months of careful preparation by a small team, 9 man-years of software, i.e. around 100 control programs amounting to more than 40'000 instructions, have been produced in 6 months by 6 experienced full-time software engineers and 24 part-time engineers and technicians, part of whom had never programmed before. The delivered product met the users specifications, was completed within schedule, conformed to the standards and was fully documented.","PeriodicalId":344026,"journal":{"name":"SIGMINI '78","volume":"61 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Structured design benefits to a process control software project\",\"authors\":\"G. Benincasa, A. Daneels, P. Heymans, C. Serre\",\"doi\":\"10.1145/800218.806638\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A 12-man-year process control software project has been successfully completed in 12 months without interruption of the production process of CERN PS accelerators. After 6 months of careful preparation by a small team, 9 man-years of software, i.e. around 100 control programs amounting to more than 40'000 instructions, have been produced in 6 months by 6 experienced full-time software engineers and 24 part-time engineers and technicians, part of whom had never programmed before. The delivered product met the users specifications, was completed within schedule, conformed to the standards and was fully documented.\",\"PeriodicalId\":344026,\"journal\":{\"name\":\"SIGMINI '78\",\"volume\":\"61 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"SIGMINI '78\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/800218.806638\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"SIGMINI '78","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/800218.806638","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Structured design benefits to a process control software project
A 12-man-year process control software project has been successfully completed in 12 months without interruption of the production process of CERN PS accelerators. After 6 months of careful preparation by a small team, 9 man-years of software, i.e. around 100 control programs amounting to more than 40'000 instructions, have been produced in 6 months by 6 experienced full-time software engineers and 24 part-time engineers and technicians, part of whom had never programmed before. The delivered product met the users specifications, was completed within schedule, conformed to the standards and was fully documented.