{"title":"华南互联电力系统直流系统故障后发电机跳闸的恢复策略","authors":"G. Cheng, Z. Xu, J. Chao","doi":"10.1109/TDC.2006.1668656","DOIUrl":null,"url":null,"abstract":"When such severe contingency as double pole block fault arouses instability in the South China interconnected power system (SCIPS), selective tripping of generating units in the sending end has to be used as a method to maintain system stability. In case the tripped units go through a shutdown and cold start cycle for long duration, it is desirable that they should be hot started and resynchronized to the system as soon as possible to make a quick recovery of the system after fault. Under conditions where the DC fault is permanent, however, such objective is difficult to achieve. This paper presents a control strategy that power generation of some running units be reduced during this process to permit the tripped units to be resynchronized to the system without changing the power level at the sending end, which enables the tripped units to be restored to load rapidly without disturbing system stability. With user models developed in PSS/E, simulations were performed on the SCIPS to investigate the system behavior during reloading process of those thermal units which had been tripped following DC block fault. The results show that power generation at the sending end can be maintained at a reasonable steady level when output of some running units are appropriately reduced during the reloading process of the thermal units, thus having little impact on the system stability, which demonstrates the feasibility and effectiveness of the proposed scheme","PeriodicalId":123024,"journal":{"name":"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition","volume":"95 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Restoration Strategies for the South China Interconnected Power System after Generator Tripping following DC System Fault\",\"authors\":\"G. Cheng, Z. Xu, J. Chao\",\"doi\":\"10.1109/TDC.2006.1668656\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"When such severe contingency as double pole block fault arouses instability in the South China interconnected power system (SCIPS), selective tripping of generating units in the sending end has to be used as a method to maintain system stability. In case the tripped units go through a shutdown and cold start cycle for long duration, it is desirable that they should be hot started and resynchronized to the system as soon as possible to make a quick recovery of the system after fault. Under conditions where the DC fault is permanent, however, such objective is difficult to achieve. This paper presents a control strategy that power generation of some running units be reduced during this process to permit the tripped units to be resynchronized to the system without changing the power level at the sending end, which enables the tripped units to be restored to load rapidly without disturbing system stability. With user models developed in PSS/E, simulations were performed on the SCIPS to investigate the system behavior during reloading process of those thermal units which had been tripped following DC block fault. The results show that power generation at the sending end can be maintained at a reasonable steady level when output of some running units are appropriately reduced during the reloading process of the thermal units, thus having little impact on the system stability, which demonstrates the feasibility and effectiveness of the proposed scheme\",\"PeriodicalId\":123024,\"journal\":{\"name\":\"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition\",\"volume\":\"95 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-05-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC.2006.1668656\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2006.1668656","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

当双极块故障等严重突发事件引起华南互联电力系统失稳时,必须采用发端发电机组选择性跳闸的方法来维持系统稳定。当跳闸机组长时间经历停机和冷启动循环时,应尽快对跳闸机组进行热启动并重新同步到系统中,使系统在故障后能够快速恢复。然而,在直流故障是永久性的情况下,这一目标很难实现。本文提出了一种控制策略,即在不改变发送端的功率水平的情况下,减少部分运行机组的发电量,使跳闸机组重新同步到系统中,从而使跳闸机组在不影响系统稳定性的情况下迅速恢复到负荷状态。通过在PSS/E中建立用户模型,在SCIPS上进行了仿真,研究了在直流块故障后跳闸的热机组在重新加载过程中的系统行为。结果表明,在热电机组再负荷过程中,适当减少部分运行机组的出力,可使送电端发电量保持在合理的稳定水平,对系统稳定性影响较小,证明了所提方案的可行性和有效性
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Restoration Strategies for the South China Interconnected Power System after Generator Tripping following DC System Fault
When such severe contingency as double pole block fault arouses instability in the South China interconnected power system (SCIPS), selective tripping of generating units in the sending end has to be used as a method to maintain system stability. In case the tripped units go through a shutdown and cold start cycle for long duration, it is desirable that they should be hot started and resynchronized to the system as soon as possible to make a quick recovery of the system after fault. Under conditions where the DC fault is permanent, however, such objective is difficult to achieve. This paper presents a control strategy that power generation of some running units be reduced during this process to permit the tripped units to be resynchronized to the system without changing the power level at the sending end, which enables the tripped units to be restored to load rapidly without disturbing system stability. With user models developed in PSS/E, simulations were performed on the SCIPS to investigate the system behavior during reloading process of those thermal units which had been tripped following DC block fault. The results show that power generation at the sending end can be maintained at a reasonable steady level when output of some running units are appropriately reduced during the reloading process of the thermal units, thus having little impact on the system stability, which demonstrates the feasibility and effectiveness of the proposed scheme
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信