{"title":"准时制(JIT)生产和过程周期时间可变性","authors":"Menberu Lulu, J. Black","doi":"10.1145/41824.41839","DOIUrl":null,"url":null,"abstract":"The effects of process cycle time variability on the performance of a zero inventory simulation model of a Just-In-Time Manufacturing and Production System (JITMPS) is investigated. Process cycle time variability does not adversely affect the performance of a Kanban- linked process structure. However, it does lengthen product cycle time and product throughput time, and lower system utilization on directly linked process structure. Modifying a directly linked process structure to include one accumulator with one unit of float between each individual process eliminates these adverse effects.","PeriodicalId":186490,"journal":{"name":"Annual Simulation Symposium","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1987-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Just-in-time (JIT) production and process cycle time variability\",\"authors\":\"Menberu Lulu, J. Black\",\"doi\":\"10.1145/41824.41839\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The effects of process cycle time variability on the performance of a zero inventory simulation model of a Just-In-Time Manufacturing and Production System (JITMPS) is investigated. Process cycle time variability does not adversely affect the performance of a Kanban- linked process structure. However, it does lengthen product cycle time and product throughput time, and lower system utilization on directly linked process structure. Modifying a directly linked process structure to include one accumulator with one unit of float between each individual process eliminates these adverse effects.\",\"PeriodicalId\":186490,\"journal\":{\"name\":\"Annual Simulation Symposium\",\"volume\":\"17 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1987-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Annual Simulation Symposium\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/41824.41839\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Annual Simulation Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/41824.41839","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Just-in-time (JIT) production and process cycle time variability
The effects of process cycle time variability on the performance of a zero inventory simulation model of a Just-In-Time Manufacturing and Production System (JITMPS) is investigated. Process cycle time variability does not adversely affect the performance of a Kanban- linked process structure. However, it does lengthen product cycle time and product throughput time, and lower system utilization on directly linked process structure. Modifying a directly linked process structure to include one accumulator with one unit of float between each individual process eliminates these adverse effects.