{"title":"集成微电网运行大容量感应电机-泵机组的暂态稳定性分析","authors":"Subhakanta Khatua, V. Mukherjee, R. Ramanavasu","doi":"10.1109/ICPEDC47771.2019.9036518","DOIUrl":null,"url":null,"abstract":"In this paper, large Induction Motor Pump Set (IMPS) of capacity (4 x 1 MW) in a Sea Water Desalination Plant (SWDP) has been chosen for operating through an Integrated microgrid (IMG). The solar, emergency diesel generator set and utility grid are interconnected together to form an IMG for providing continuous power to the SWDP. The main objective is to investigate the transient stability of IMG during normal operation and fault situations under ongrid and islanded mode. One simulation case study has been carried out on the proposed IMG by performing load flow and transient analysis by adopting accelerated Gauss-seidel method in ETAP software (version- 16.0.0). Based on the analysis, it is found that rate of change of frequency as well as transient overload faults are the major huddle for operation of IMPS in IMG. So the frequency drive based soft starter for starting of such IMPS.","PeriodicalId":426923,"journal":{"name":"2019 2nd International Conference on Power and Embedded Drive Control (ICPEDC)","volume":"24 3","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Transient Stability Analysis of Large Capacity Induction Motor- Pump Sets Operated Though an Integrated Microgrid\",\"authors\":\"Subhakanta Khatua, V. Mukherjee, R. Ramanavasu\",\"doi\":\"10.1109/ICPEDC47771.2019.9036518\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, large Induction Motor Pump Set (IMPS) of capacity (4 x 1 MW) in a Sea Water Desalination Plant (SWDP) has been chosen for operating through an Integrated microgrid (IMG). The solar, emergency diesel generator set and utility grid are interconnected together to form an IMG for providing continuous power to the SWDP. The main objective is to investigate the transient stability of IMG during normal operation and fault situations under ongrid and islanded mode. One simulation case study has been carried out on the proposed IMG by performing load flow and transient analysis by adopting accelerated Gauss-seidel method in ETAP software (version- 16.0.0). Based on the analysis, it is found that rate of change of frequency as well as transient overload faults are the major huddle for operation of IMPS in IMG. So the frequency drive based soft starter for starting of such IMPS.\",\"PeriodicalId\":426923,\"journal\":{\"name\":\"2019 2nd International Conference on Power and Embedded Drive Control (ICPEDC)\",\"volume\":\"24 3\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 2nd International Conference on Power and Embedded Drive Control (ICPEDC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICPEDC47771.2019.9036518\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 2nd International Conference on Power and Embedded Drive Control (ICPEDC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPEDC47771.2019.9036518","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在本文中,选择了海水淡化厂(SWDP)中容量(4 x 1 MW)的大型感应电机泵组(IMPS)通过集成微电网(IMG)运行。太阳能、应急柴油发电机组和公用电网相互连接在一起,形成一个IMG,为SWDP提供持续的电力。主要目的是研究在电网和孤岛模式下IMG在正常运行和故障情况下的暂态稳定性。在ETAP软件(version- 16.0.0)中采用加速Gauss-seidel方法对所提出的IMG进行了负荷流和暂态分析的仿真案例研究。通过分析发现,频率变化率和瞬态过载故障是IMG中IMPS运行的主要问题。因此,采用基于变频驱动的软起动器对此类IMPS进行起动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Transient Stability Analysis of Large Capacity Induction Motor- Pump Sets Operated Though an Integrated Microgrid
In this paper, large Induction Motor Pump Set (IMPS) of capacity (4 x 1 MW) in a Sea Water Desalination Plant (SWDP) has been chosen for operating through an Integrated microgrid (IMG). The solar, emergency diesel generator set and utility grid are interconnected together to form an IMG for providing continuous power to the SWDP. The main objective is to investigate the transient stability of IMG during normal operation and fault situations under ongrid and islanded mode. One simulation case study has been carried out on the proposed IMG by performing load flow and transient analysis by adopting accelerated Gauss-seidel method in ETAP software (version- 16.0.0). Based on the analysis, it is found that rate of change of frequency as well as transient overload faults are the major huddle for operation of IMPS in IMG. So the frequency drive based soft starter for starting of such IMPS.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信