{"title":"投射和优化现金流多项目模型","authors":"Resela Irpiena","doi":"10.9744/DUTS.3.2.1-8","DOIUrl":null,"url":null,"abstract":"This study aims to create an integrated system that has the ability to project the schedule and cash flow of a multi project situation for construction companies, while optimizing them so that a more efficient schedule and financial planning is achieved. In this study, an efficient construction planning refers to a schedule combination that generates a cash flow with minimum overdraft for the company.This study focuses on utilizing floats from non-critical activities in initial or as-planned schedule. Iteration on the floats is done with evolutionary algorithm optimization method using projects’ durations and credit limit as constraints. The result is a combination of multi project schedules which generates the least amount of overdraft throughout the fiscal year to achieve minimum loans of thecompany.","PeriodicalId":187066,"journal":{"name":"Dimensi Utama Teknik Sipil","volume":"300 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Model Proyeksi Dan Optimalisasi Cash Flow Multi Proyek\",\"authors\":\"Resela Irpiena\",\"doi\":\"10.9744/DUTS.3.2.1-8\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study aims to create an integrated system that has the ability to project the schedule and cash flow of a multi project situation for construction companies, while optimizing them so that a more efficient schedule and financial planning is achieved. In this study, an efficient construction planning refers to a schedule combination that generates a cash flow with minimum overdraft for the company.This study focuses on utilizing floats from non-critical activities in initial or as-planned schedule. Iteration on the floats is done with evolutionary algorithm optimization method using projects’ durations and credit limit as constraints. The result is a combination of multi project schedules which generates the least amount of overdraft throughout the fiscal year to achieve minimum loans of thecompany.\",\"PeriodicalId\":187066,\"journal\":{\"name\":\"Dimensi Utama Teknik Sipil\",\"volume\":\"300 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-10-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Dimensi Utama Teknik Sipil\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.9744/DUTS.3.2.1-8\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Dimensi Utama Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.9744/DUTS.3.2.1-8","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Model Proyeksi Dan Optimalisasi Cash Flow Multi Proyek
This study aims to create an integrated system that has the ability to project the schedule and cash flow of a multi project situation for construction companies, while optimizing them so that a more efficient schedule and financial planning is achieved. In this study, an efficient construction planning refers to a schedule combination that generates a cash flow with minimum overdraft for the company.This study focuses on utilizing floats from non-critical activities in initial or as-planned schedule. Iteration on the floats is done with evolutionary algorithm optimization method using projects’ durations and credit limit as constraints. The result is a combination of multi project schedules which generates the least amount of overdraft throughout the fiscal year to achieve minimum loans of thecompany.