{"title":"利用数字化数据管理解决方案分析输电线路接地技术","authors":"J. Aylor, W. Pike, James Shaheen, Kristopher Van Norman, Callum Weinberg","doi":"10.1109/SIEDS.2016.7489312","DOIUrl":null,"url":null,"abstract":"In 2014, the Occupational Safety and Health Administration (OSHA) created new regulations regarding safe work practices for transmission line construction. These new regulations primarily focus upon improving the practices of grounding equipment during construction to create a safer work zone. Workers are at risk of touch and step potentials from high voltage lines and current propagation through the surrounding soil. Specifically, the regulation requires construction companies, such as Pike Corporation, to utilize protective equipment called equipotential grounding mats instead of conventional grounding rod systems, unless they can prove through an engineering study that a job will be safe to commence using traditional methodology. The team created a data management tool that can help Pike Corporation synthesize a variety of data inputs to determine which means of protection is best for a particular job. The project's secondary objective is to evaluate the impact of these regulations (and the solution within this context) on the company's strategy. Impacts on the company could be reported in terms of additional cost incurred or material resources consumed as a result of these changes. This study will help Pike Corporation make safe and cost-effective business decisions and will also help the industry to better understand the risks to workers and the potential benefits of equipotential grounding mats.","PeriodicalId":426864,"journal":{"name":"2016 IEEE Systems and Information Engineering Design Symposium (SIEDS)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-04-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An analysis of transmission line grounding techniques using a digitized data management solution\",\"authors\":\"J. Aylor, W. Pike, James Shaheen, Kristopher Van Norman, Callum Weinberg\",\"doi\":\"10.1109/SIEDS.2016.7489312\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In 2014, the Occupational Safety and Health Administration (OSHA) created new regulations regarding safe work practices for transmission line construction. These new regulations primarily focus upon improving the practices of grounding equipment during construction to create a safer work zone. Workers are at risk of touch and step potentials from high voltage lines and current propagation through the surrounding soil. Specifically, the regulation requires construction companies, such as Pike Corporation, to utilize protective equipment called equipotential grounding mats instead of conventional grounding rod systems, unless they can prove through an engineering study that a job will be safe to commence using traditional methodology. The team created a data management tool that can help Pike Corporation synthesize a variety of data inputs to determine which means of protection is best for a particular job. The project's secondary objective is to evaluate the impact of these regulations (and the solution within this context) on the company's strategy. Impacts on the company could be reported in terms of additional cost incurred or material resources consumed as a result of these changes. This study will help Pike Corporation make safe and cost-effective business decisions and will also help the industry to better understand the risks to workers and the potential benefits of equipotential grounding mats.\",\"PeriodicalId\":426864,\"journal\":{\"name\":\"2016 IEEE Systems and Information Engineering Design Symposium (SIEDS)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-04-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 IEEE Systems and Information Engineering Design Symposium (SIEDS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SIEDS.2016.7489312\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE Systems and Information Engineering Design Symposium (SIEDS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SIEDS.2016.7489312","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

2014年,职业安全与健康管理局(OSHA)制定了关于输电线路建设安全工作实践的新规定。这些新规定主要侧重于改善施工期间接地设备的做法,以创造一个更安全的工作区域。工人有接触和步进电位的危险,高压线路和电流通过周围土壤传播。具体来说,该法规要求建筑公司,如派克公司,使用称为等电位接地垫的保护设备,而不是传统的接地棒系统,除非他们能通过工程研究证明使用传统方法开始工作是安全的。该团队创建了一个数据管理工具,可以帮助Pike公司综合各种数据输入,以确定哪种保护手段最适合特定作业。该项目的第二个目标是评估这些法规(以及在此背景下的解决方案)对公司战略的影响。对公司的影响可以根据这些变化所产生的额外成本或消耗的材料资源来报告。这项研究将帮助派克公司做出安全和具有成本效益的商业决策,也将帮助该行业更好地了解工人的风险和等电位接地垫的潜在好处。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An analysis of transmission line grounding techniques using a digitized data management solution
In 2014, the Occupational Safety and Health Administration (OSHA) created new regulations regarding safe work practices for transmission line construction. These new regulations primarily focus upon improving the practices of grounding equipment during construction to create a safer work zone. Workers are at risk of touch and step potentials from high voltage lines and current propagation through the surrounding soil. Specifically, the regulation requires construction companies, such as Pike Corporation, to utilize protective equipment called equipotential grounding mats instead of conventional grounding rod systems, unless they can prove through an engineering study that a job will be safe to commence using traditional methodology. The team created a data management tool that can help Pike Corporation synthesize a variety of data inputs to determine which means of protection is best for a particular job. The project's secondary objective is to evaluate the impact of these regulations (and the solution within this context) on the company's strategy. Impacts on the company could be reported in terms of additional cost incurred or material resources consumed as a result of these changes. This study will help Pike Corporation make safe and cost-effective business decisions and will also help the industry to better understand the risks to workers and the potential benefits of equipotential grounding mats.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信