使用电池储能系统推迟变电站升级

S. Pienaar, K. Kusakana, P. Manditereza
{"title":"使用电池储能系统推迟变电站升级","authors":"S. Pienaar, K. Kusakana, P. Manditereza","doi":"10.1109/OI.2018.8535635","DOIUrl":null,"url":null,"abstract":"Electricity is generated and distributed instantaneously. In electricity utilities, this is occasionally an enormous amount of wasted capacity. Illegal connections may contribute to overloads and trips, as the network is carrying more users than what it was designed for. Before substation upgrades may take place, new and existing consumers who need additional electricity are rejected, due to capacity constraints in existing substations. The installation of large scale battery energy storage systems may support the long-term carbon mitigation strategy of South Africa, to transition to a low carbon economy. The aim of this paper is to propose a Battery Energy Storage System (BESS) design that may lead to costly network upgrade deferral and reduced demand charges.","PeriodicalId":331140,"journal":{"name":"2018 Open Innovations Conference (OI)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2018-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Usage of Battery Energy Storage Systems to Defer Substation Upgrades\",\"authors\":\"S. Pienaar, K. Kusakana, P. Manditereza\",\"doi\":\"10.1109/OI.2018.8535635\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Electricity is generated and distributed instantaneously. In electricity utilities, this is occasionally an enormous amount of wasted capacity. Illegal connections may contribute to overloads and trips, as the network is carrying more users than what it was designed for. Before substation upgrades may take place, new and existing consumers who need additional electricity are rejected, due to capacity constraints in existing substations. The installation of large scale battery energy storage systems may support the long-term carbon mitigation strategy of South Africa, to transition to a low carbon economy. The aim of this paper is to propose a Battery Energy Storage System (BESS) design that may lead to costly network upgrade deferral and reduced demand charges.\",\"PeriodicalId\":331140,\"journal\":{\"name\":\"2018 Open Innovations Conference (OI)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 Open Innovations Conference (OI)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/OI.2018.8535635\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 Open Innovations Conference (OI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/OI.2018.8535635","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

电力是瞬间产生和分配的。在电力公司,这偶尔会造成大量的产能浪费。非法连接可能会导致超载和旅行,因为网络承载的用户数量超过了其设计容量。在变电站升级之前,由于现有变电站的容量限制,需要额外电力的新用户和现有用户被拒绝。安装大型电池储能系统可以支持南非向低碳经济过渡的长期碳减排战略。本文的目的是提出一种可能导致昂贵的网络升级延迟和降低需求费用的电池储能系统(BESS)设计。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Usage of Battery Energy Storage Systems to Defer Substation Upgrades
Electricity is generated and distributed instantaneously. In electricity utilities, this is occasionally an enormous amount of wasted capacity. Illegal connections may contribute to overloads and trips, as the network is carrying more users than what it was designed for. Before substation upgrades may take place, new and existing consumers who need additional electricity are rejected, due to capacity constraints in existing substations. The installation of large scale battery energy storage systems may support the long-term carbon mitigation strategy of South Africa, to transition to a low carbon economy. The aim of this paper is to propose a Battery Energy Storage System (BESS) design that may lead to costly network upgrade deferral and reduced demand charges.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信