{"title":"测试程序设置重新托管","authors":"U.Z. Sanal","doi":"10.1109/AUTEST.2000.885597","DOIUrl":null,"url":null,"abstract":"In this study the advantages and disadvantages of rehosting will be presented based on a real world project the critical points of a project, mainly depending on rehosting of large number of test program sets (TPS) on various automated test equipments (ATE) are covered. To name few of the topics to be presented in this study, quality of unit under test (UUT) data; quality of the former TPS to be rehosted; technology of the TPS (digital, analog, hybrid, etc.); ATEs; Software (SW) development environment, SW tools and translators; interface test adapters (ITA); contractual requirements; mating connectors, test connectors and fixtures; evaluation of a TPS to be rehosted. This study covers all the processes ranging from the inspection of the available data to the estimation of the rehosting duration and cost.","PeriodicalId":334061,"journal":{"name":"2000 IEEE Autotestcon Proceedings. IEEE Systems Readiness Technology Conference. Future Sustainment for Military Aerospace (Cat. No.00CH37057)","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-09-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Test program set rehosting\",\"authors\":\"U.Z. Sanal\",\"doi\":\"10.1109/AUTEST.2000.885597\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this study the advantages and disadvantages of rehosting will be presented based on a real world project the critical points of a project, mainly depending on rehosting of large number of test program sets (TPS) on various automated test equipments (ATE) are covered. To name few of the topics to be presented in this study, quality of unit under test (UUT) data; quality of the former TPS to be rehosted; technology of the TPS (digital, analog, hybrid, etc.); ATEs; Software (SW) development environment, SW tools and translators; interface test adapters (ITA); contractual requirements; mating connectors, test connectors and fixtures; evaluation of a TPS to be rehosted. This study covers all the processes ranging from the inspection of the available data to the estimation of the rehosting duration and cost.\",\"PeriodicalId\":334061,\"journal\":{\"name\":\"2000 IEEE Autotestcon Proceedings. IEEE Systems Readiness Technology Conference. Future Sustainment for Military Aerospace (Cat. No.00CH37057)\",\"volume\":\"15 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2000-09-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2000 IEEE Autotestcon Proceedings. IEEE Systems Readiness Technology Conference. Future Sustainment for Military Aerospace (Cat. No.00CH37057)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AUTEST.2000.885597\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2000 IEEE Autotestcon Proceedings. IEEE Systems Readiness Technology Conference. Future Sustainment for Military Aerospace (Cat. No.00CH37057)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AUTEST.2000.885597","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
In this study the advantages and disadvantages of rehosting will be presented based on a real world project the critical points of a project, mainly depending on rehosting of large number of test program sets (TPS) on various automated test equipments (ATE) are covered. To name few of the topics to be presented in this study, quality of unit under test (UUT) data; quality of the former TPS to be rehosted; technology of the TPS (digital, analog, hybrid, etc.); ATEs; Software (SW) development environment, SW tools and translators; interface test adapters (ITA); contractual requirements; mating connectors, test connectors and fixtures; evaluation of a TPS to be rehosted. This study covers all the processes ranging from the inspection of the available data to the estimation of the rehosting duration and cost.