{"title":"用交叉法计算4号坑煤储量","authors":"Shabiruddin Shabiruddin, A. Anshariah, H. Bakri","doi":"10.58227/jge.v1i1.4","DOIUrl":null,"url":null,"abstract":"Calculating coal reserves using the vertical section method can describe the condition of deposits and overburden in each section. This study aimed to determine the direction of coal distribution, the volume of overburden, and the volume of coal using the cross-section method and to obtain the stripping ratio (SR). In this research activity, data is needed in the form of documentation on pit 4, cross-section, drill logs, and coordinates of drill points. After all the data has been collected, it is continued by making a cross-section in the form of a horizontal (cross-section) using Auto Cad software. The final stage of the interpretation of the two data results is calculating the number of coal reserves, the amount of overburden (OB), and the stripping ratio value by the concept of continuity that has been carried out from the existing data.","PeriodicalId":446458,"journal":{"name":"Journal of Geology and Exploration","volume":"116 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Calculation of PIT 4 Coal Reserves with Cross-Cross Method\",\"authors\":\"Shabiruddin Shabiruddin, A. Anshariah, H. Bakri\",\"doi\":\"10.58227/jge.v1i1.4\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Calculating coal reserves using the vertical section method can describe the condition of deposits and overburden in each section. This study aimed to determine the direction of coal distribution, the volume of overburden, and the volume of coal using the cross-section method and to obtain the stripping ratio (SR). In this research activity, data is needed in the form of documentation on pit 4, cross-section, drill logs, and coordinates of drill points. After all the data has been collected, it is continued by making a cross-section in the form of a horizontal (cross-section) using Auto Cad software. The final stage of the interpretation of the two data results is calculating the number of coal reserves, the amount of overburden (OB), and the stripping ratio value by the concept of continuity that has been carried out from the existing data.\",\"PeriodicalId\":446458,\"journal\":{\"name\":\"Journal of Geology and Exploration\",\"volume\":\"116 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-06-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Geology and Exploration\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.58227/jge.v1i1.4\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Geology and Exploration","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.58227/jge.v1i1.4","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

采用垂直剖面法计算煤层储量,可以描述各剖面的赋存状况和覆岩状况。本研究旨在利用截面法确定煤的分布方向、覆岩体积和煤的体积,并获得剥脱比(SR)。在这项研究活动中,需要以4号坑、横截面、钻井日志和钻探点坐标的文件形式获得数据。收集完所有数据后,使用Auto Cad软件以水平(横截面)的形式制作截面,继续进行。对两组数据结果进行解释的最后阶段是利用已有数据进行的连续性概念计算煤储量数、覆岩量(OB)和剥脱比值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Calculation of PIT 4 Coal Reserves with Cross-Cross Method
Calculating coal reserves using the vertical section method can describe the condition of deposits and overburden in each section. This study aimed to determine the direction of coal distribution, the volume of overburden, and the volume of coal using the cross-section method and to obtain the stripping ratio (SR). In this research activity, data is needed in the form of documentation on pit 4, cross-section, drill logs, and coordinates of drill points. After all the data has been collected, it is continued by making a cross-section in the form of a horizontal (cross-section) using Auto Cad software. The final stage of the interpretation of the two data results is calculating the number of coal reserves, the amount of overburden (OB), and the stripping ratio value by the concept of continuity that has been carried out from the existing data.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信