{"title":"桩锤振动对土体变形的影响——以北干巴鲁-杜麦公路建设5段为例","authors":"F. Syarif, H. Kausarian, D. B. E. Putra","doi":"10.5220/0009129901200124","DOIUrl":null,"url":null,"abstract":": In the Pekanbaru-Dumai highway road construction in Section 5 will be built a bridge. The construction of the bridge is in the area of PT TGI gas pipeline. The construction of this bridge uses a pile foundation whose pile is carried out using a beating method using a hammer. The diameter of this pile is 60 cm with a hammer weight of 5 tons and a height of fall of 2.5 meters. This work method will produce vibrations that affect the condition of the gas pipe. One of the aspects that are affected by vibration is the deformation of the soil around the gas pipe. This soil deformation will affect the position of the gas pipe which, if it forms a fairly large slope, may cause gas pipelines to crack. The method used to determine the effect of vibration from the design of the gas pipeline is to use a vibration meter tool. vibration meter is a sensor device that is placed on the stake and on the ground above the gas pipe so that how much vibration and deformation of the soil can be seen. As a result from the test using vibration meter, it was found that the greater the wave velocity due to the design, the greater the deformation that occurs on the soil.","PeriodicalId":382428,"journal":{"name":"Proceedings of the Second International Conference on Science, Engineering and Technology","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Impact of Vibration of Piling Hammer on Soil Deformation: Study Case in Highway Construction Section 5 Pekanbaru-Dumai\",\"authors\":\"F. Syarif, H. Kausarian, D. B. E. Putra\",\"doi\":\"10.5220/0009129901200124\",\"DOIUrl\":null,\"url\":null,\"abstract\":\": In the Pekanbaru-Dumai highway road construction in Section 5 will be built a bridge. The construction of the bridge is in the area of PT TGI gas pipeline. The construction of this bridge uses a pile foundation whose pile is carried out using a beating method using a hammer. The diameter of this pile is 60 cm with a hammer weight of 5 tons and a height of fall of 2.5 meters. This work method will produce vibrations that affect the condition of the gas pipe. One of the aspects that are affected by vibration is the deformation of the soil around the gas pipe. This soil deformation will affect the position of the gas pipe which, if it forms a fairly large slope, may cause gas pipelines to crack. The method used to determine the effect of vibration from the design of the gas pipeline is to use a vibration meter tool. vibration meter is a sensor device that is placed on the stake and on the ground above the gas pipe so that how much vibration and deformation of the soil can be seen. As a result from the test using vibration meter, it was found that the greater the wave velocity due to the design, the greater the deformation that occurs on the soil.\",\"PeriodicalId\":382428,\"journal\":{\"name\":\"Proceedings of the Second International Conference on Science, Engineering and Technology\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Second International Conference on Science, Engineering and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5220/0009129901200124\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Second International Conference on Science, Engineering and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5220/0009129901200124","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Impact of Vibration of Piling Hammer on Soil Deformation: Study Case in Highway Construction Section 5 Pekanbaru-Dumai
: In the Pekanbaru-Dumai highway road construction in Section 5 will be built a bridge. The construction of the bridge is in the area of PT TGI gas pipeline. The construction of this bridge uses a pile foundation whose pile is carried out using a beating method using a hammer. The diameter of this pile is 60 cm with a hammer weight of 5 tons and a height of fall of 2.5 meters. This work method will produce vibrations that affect the condition of the gas pipe. One of the aspects that are affected by vibration is the deformation of the soil around the gas pipe. This soil deformation will affect the position of the gas pipe which, if it forms a fairly large slope, may cause gas pipelines to crack. The method used to determine the effect of vibration from the design of the gas pipeline is to use a vibration meter tool. vibration meter is a sensor device that is placed on the stake and on the ground above the gas pipe so that how much vibration and deformation of the soil can be seen. As a result from the test using vibration meter, it was found that the greater the wave velocity due to the design, the greater the deformation that occurs on the soil.