{"title":"运输公路改善利用地理质地提高了哥伦比亚山林矿山785的高清生产力","authors":"Perbaikan Jalan, Angkut Menggunakan, Geotextile Untuk, Meningkatkan Produktivitas, Pada Site Gurimbang, Berau Coal","doi":"10.35139/cantilever.v12i1.213","DOIUrl":null,"url":null,"abstract":"PT. Berau Coal is one of the mining companies in Indonesia that focuses on coal mining and sales. This research was carried out on the haul road at Site Gurimbang Mine Operation, where the condition of the haul road is currently undulating and located above a swamp area. This condition reduces the speed of HD 785, resulting in the unit's productivity not achieving the company's target. The effort to improve the condition of the haul road is by using geotextile as a method of strengthening the haul road. The aim of this research is to determine the changes in soil density and soil bearing capacity after the geotextile reinforcement and to identify its impact on HD 785 productivity. The research was conducted by analyzing and processing data from the results of the DCP in-situ test to determine the soil density and soil bearing capacity in the initial and post-geotextile installation conditions. Actual field data collection in the form of HD 785 cycle time and speed data was used to evaluate the unit's productivity before and after geotextile installation. The results indicated that the utilizing geotextile can increase the soil density and soil bearing capacity to meet the CBR standards and soil bearing capacity for HD 785 units. The use of geotextile also increased the speed of HD 785 by 3 km/hour, both during load and empty travel, resulting in an increase in HD 785 productivity by 26% from the initial 43,821.63 bcm/month to 55,375.62 bcm/month. \n  \n  \n ","PeriodicalId":338977,"journal":{"name":"Cantilever: Jurnal Penelitian dan Kajian Bidang Teknik Sipil","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Perbaikan Jalan Angkut Menggunakan Geotextile untuk Meningkatkan Produktivitas HD 785 pada Site Gurimbang Mine Operation, PT. Berau Coal\",\"authors\":\"Perbaikan Jalan, Angkut Menggunakan, Geotextile Untuk, Meningkatkan Produktivitas, Pada Site Gurimbang, Berau Coal\",\"doi\":\"10.35139/cantilever.v12i1.213\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PT. Berau Coal is one of the mining companies in Indonesia that focuses on coal mining and sales. This research was carried out on the haul road at Site Gurimbang Mine Operation, where the condition of the haul road is currently undulating and located above a swamp area. This condition reduces the speed of HD 785, resulting in the unit's productivity not achieving the company's target. The effort to improve the condition of the haul road is by using geotextile as a method of strengthening the haul road. The aim of this research is to determine the changes in soil density and soil bearing capacity after the geotextile reinforcement and to identify its impact on HD 785 productivity. The research was conducted by analyzing and processing data from the results of the DCP in-situ test to determine the soil density and soil bearing capacity in the initial and post-geotextile installation conditions. Actual field data collection in the form of HD 785 cycle time and speed data was used to evaluate the unit's productivity before and after geotextile installation. The results indicated that the utilizing geotextile can increase the soil density and soil bearing capacity to meet the CBR standards and soil bearing capacity for HD 785 units. The use of geotextile also increased the speed of HD 785 by 3 km/hour, both during load and empty travel, resulting in an increase in HD 785 productivity by 26% from the initial 43,821.63 bcm/month to 55,375.62 bcm/month. \\n  \\n  \\n \",\"PeriodicalId\":338977,\"journal\":{\"name\":\"Cantilever: Jurnal Penelitian dan Kajian Bidang Teknik Sipil\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Cantilever: Jurnal Penelitian dan Kajian Bidang Teknik Sipil\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.35139/cantilever.v12i1.213\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Cantilever: Jurnal Penelitian dan Kajian Bidang Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35139/cantilever.v12i1.213","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

PT. Berau Coal是印尼一家专注于煤炭开采和销售的矿业公司。本次研究是在九林邦矿山作业现场的运输道路上进行的,目前运输道路的状况起伏不定,位于沼泽地区之上。这种情况降低了HD 785的速度,导致该设备的生产率无法达到公司的目标。利用土工布作为加固运输道路的一种方法,努力改善运输道路的状况。本研究的目的是确定土工布加固后土壤密度和土壤承载力的变化,并确定其对hd785生产力的影响。本研究通过对DCP现场试验结果的数据进行分析处理,确定土工布初始和后安装条件下的土壤密度和土壤承载力。以hd785循环时间和速度数据的形式收集实际现场数据,用于评估安装土工布前后机组的生产率。结果表明,采用土工布可提高土工密度和承载力,达到hd785机组CBR标准和承载力要求。土工布的使用还将HD 785的速度提高了3公里/小时,无论是在负载还是空载过程中,HD 785的生产率都从最初的43,821.63亿立方米/月提高到55,375.62亿立方米/月,提高了26%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Perbaikan Jalan Angkut Menggunakan Geotextile untuk Meningkatkan Produktivitas HD 785 pada Site Gurimbang Mine Operation, PT. Berau Coal
PT. Berau Coal is one of the mining companies in Indonesia that focuses on coal mining and sales. This research was carried out on the haul road at Site Gurimbang Mine Operation, where the condition of the haul road is currently undulating and located above a swamp area. This condition reduces the speed of HD 785, resulting in the unit's productivity not achieving the company's target. The effort to improve the condition of the haul road is by using geotextile as a method of strengthening the haul road. The aim of this research is to determine the changes in soil density and soil bearing capacity after the geotextile reinforcement and to identify its impact on HD 785 productivity. The research was conducted by analyzing and processing data from the results of the DCP in-situ test to determine the soil density and soil bearing capacity in the initial and post-geotextile installation conditions. Actual field data collection in the form of HD 785 cycle time and speed data was used to evaluate the unit's productivity before and after geotextile installation. The results indicated that the utilizing geotextile can increase the soil density and soil bearing capacity to meet the CBR standards and soil bearing capacity for HD 785 units. The use of geotextile also increased the speed of HD 785 by 3 km/hour, both during load and empty travel, resulting in an increase in HD 785 productivity by 26% from the initial 43,821.63 bcm/month to 55,375.62 bcm/month.      
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信