未来作战系统的预测

P. Barton
{"title":"未来作战系统的预测","authors":"P. Barton","doi":"10.1109/MIM.2007.4291216","DOIUrl":null,"url":null,"abstract":"Maintenance and repair of weapons systems is an ever-increasing part of the total cost. The time to repair faults can also have a major impact on system availability. Prediction of faults before they occur allows removal of potentially faulty units or the pre- positioning of spares to allow quick repairs at minimal cost. Many new weapon system procurements include requirements to predict failures in subsystems before they actually occur through the use of prognostic techniques. This is a difficult task requiring innovative solutions.","PeriodicalId":361529,"journal":{"name":"2006 IEEE Autotestcon","volume":"81 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-08-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Prognostics for Combat Systems of the Future\",\"authors\":\"P. Barton\",\"doi\":\"10.1109/MIM.2007.4291216\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Maintenance and repair of weapons systems is an ever-increasing part of the total cost. The time to repair faults can also have a major impact on system availability. Prediction of faults before they occur allows removal of potentially faulty units or the pre- positioning of spares to allow quick repairs at minimal cost. Many new weapon system procurements include requirements to predict failures in subsystems before they actually occur through the use of prognostic techniques. This is a difficult task requiring innovative solutions.\",\"PeriodicalId\":361529,\"journal\":{\"name\":\"2006 IEEE Autotestcon\",\"volume\":\"81 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-08-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2006 IEEE Autotestcon\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/MIM.2007.4291216\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 IEEE Autotestcon","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MIM.2007.4291216","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

武器系统的维护和修理是总费用中不断增加的一部分。修复故障的时间也会对系统可用性产生重大影响。在故障发生之前进行预测,可以移除潜在的故障单元或预先定位备件,以便以最小的成本进行快速维修。许多新武器系统采购包括通过使用预测技术在子系统实际发生故障之前预测故障的要求。这是一项艰巨的任务,需要创新的解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Prognostics for Combat Systems of the Future
Maintenance and repair of weapons systems is an ever-increasing part of the total cost. The time to repair faults can also have a major impact on system availability. Prediction of faults before they occur allows removal of potentially faulty units or the pre- positioning of spares to allow quick repairs at minimal cost. Many new weapon system procurements include requirements to predict failures in subsystems before they actually occur through the use of prognostic techniques. This is a difficult task requiring innovative solutions.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书