考虑水电站对电力市场价格影响的遗传算法运行规划

C. Guerreiro, J. Saraiva, J. Sousa, V. Mendes
{"title":"考虑水电站对电力市场价格影响的遗传算法运行规划","authors":"C. Guerreiro, J. Saraiva, J. Sousa, V. Mendes","doi":"10.1109/EEM.2014.6861210","DOIUrl":null,"url":null,"abstract":"With the advent of restructuring, generation companies have to plan the operation of their stations in order to maximize their profits. This is very relevant for companies having a large share of hydro stations, and even more if these stations have pumping capacity. This paper describes a model to plan the operation of a set of hydro stations eventually installed in cascade and admitting that some of them are pumping stations. Once a first set of operation orders is obtained using a Genetic Algorithm, their generation/load values are included in the expected market selling/buying curves and the hourly prices are updated. These prices are then used to refine the operation orders originating an iterative process so that hydro stations are price makers. The paper includes results for a hydro system in order to illustrate the application of the developed approach.","PeriodicalId":261127,"journal":{"name":"11th International Conference on the European Energy Market (EEM14)","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Operation planning of hydro stations using genetic algorithms considering their impact on the electricity market prices\",\"authors\":\"C. Guerreiro, J. Saraiva, J. Sousa, V. Mendes\",\"doi\":\"10.1109/EEM.2014.6861210\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"With the advent of restructuring, generation companies have to plan the operation of their stations in order to maximize their profits. This is very relevant for companies having a large share of hydro stations, and even more if these stations have pumping capacity. This paper describes a model to plan the operation of a set of hydro stations eventually installed in cascade and admitting that some of them are pumping stations. Once a first set of operation orders is obtained using a Genetic Algorithm, their generation/load values are included in the expected market selling/buying curves and the hourly prices are updated. These prices are then used to refine the operation orders originating an iterative process so that hydro stations are price makers. The paper includes results for a hydro system in order to illustrate the application of the developed approach.\",\"PeriodicalId\":261127,\"journal\":{\"name\":\"11th International Conference on the European Energy Market (EEM14)\",\"volume\":\"27 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-05-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"11th International Conference on the European Energy Market (EEM14)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EEM.2014.6861210\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"11th International Conference on the European Energy Market (EEM14)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2014.6861210","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

随着结构调整的到来,发电公司必须规划电站的运营,以实现利润最大化。对于拥有大量水电站的公司来说,这是非常重要的,如果这些水电站有抽水能力,就更重要了。本文描述了一组最终安装在梯级的水电站的运行规划模型,并承认其中一些是泵站。一旦使用遗传算法获得第一组操作订单,它们的发电量/负荷值就会包含在预期的市场买卖曲线中,每小时的价格也会更新。然后,这些价格被用来改进操作指令,从而产生一个迭代过程,使水电站成为价格制定者。本文包括一个水力系统的结果,以说明所开发的方法的应用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Operation planning of hydro stations using genetic algorithms considering their impact on the electricity market prices
With the advent of restructuring, generation companies have to plan the operation of their stations in order to maximize their profits. This is very relevant for companies having a large share of hydro stations, and even more if these stations have pumping capacity. This paper describes a model to plan the operation of a set of hydro stations eventually installed in cascade and admitting that some of them are pumping stations. Once a first set of operation orders is obtained using a Genetic Algorithm, their generation/load values are included in the expected market selling/buying curves and the hourly prices are updated. These prices are then used to refine the operation orders originating an iterative process so that hydro stations are price makers. The paper includes results for a hydro system in order to illustrate the application of the developed approach.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信