{"title":"支持和部分自动化需求工程活动的方法","authors":"S.A. Fahmi, A. Ibrahim, Ho‐Jin Choi","doi":"10.1109/CIT.2008.WORKSHOPS.83","DOIUrl":null,"url":null,"abstract":"Requirements elicitation can be considered as one of the most critical and troublesome job while developing a system. Some of the requirements problems are incorrect fact, omission and inconsistency of data. Now a days, another problem is to get appointment with stakeholders for elicitation activities due to their busy schedule and mobility. Our proposed approach solves these problems by using a system that finds out unanswered part of requirements documents and generates questioners from those sections. These questions are answered by stakeholders through mobile devices and finally the system checks the answer data for consistency and then generates requirements documents that are complete and correct. We mentioned this approach partially automatic as an expert requirements analyst overall supervises the whole system.","PeriodicalId":155998,"journal":{"name":"2008 IEEE 8th International Conference on Computer and Information Technology Workshops","volume":"64 3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-07-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"An Approach to Support and Partially Automate Requirements Engineering Activities\",\"authors\":\"S.A. Fahmi, A. Ibrahim, Ho‐Jin Choi\",\"doi\":\"10.1109/CIT.2008.WORKSHOPS.83\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Requirements elicitation can be considered as one of the most critical and troublesome job while developing a system. Some of the requirements problems are incorrect fact, omission and inconsistency of data. Now a days, another problem is to get appointment with stakeholders for elicitation activities due to their busy schedule and mobility. Our proposed approach solves these problems by using a system that finds out unanswered part of requirements documents and generates questioners from those sections. These questions are answered by stakeholders through mobile devices and finally the system checks the answer data for consistency and then generates requirements documents that are complete and correct. We mentioned this approach partially automatic as an expert requirements analyst overall supervises the whole system.\",\"PeriodicalId\":155998,\"journal\":{\"name\":\"2008 IEEE 8th International Conference on Computer and Information Technology Workshops\",\"volume\":\"64 3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-07-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 IEEE 8th International Conference on Computer and Information Technology Workshops\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CIT.2008.WORKSHOPS.83\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 IEEE 8th International Conference on Computer and Information Technology Workshops","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CIT.2008.WORKSHOPS.83","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
An Approach to Support and Partially Automate Requirements Engineering Activities
Requirements elicitation can be considered as one of the most critical and troublesome job while developing a system. Some of the requirements problems are incorrect fact, omission and inconsistency of data. Now a days, another problem is to get appointment with stakeholders for elicitation activities due to their busy schedule and mobility. Our proposed approach solves these problems by using a system that finds out unanswered part of requirements documents and generates questioners from those sections. These questions are answered by stakeholders through mobile devices and finally the system checks the answer data for consistency and then generates requirements documents that are complete and correct. We mentioned this approach partially automatic as an expert requirements analyst overall supervises the whole system.