通过iso 55001的现场评估,在pertamina hulu能源控股上游(phe shu)实施维护和可靠性管理系统(mrms)

Khairil Fikri, D. B. Darmadi, Deddy Nugraha
{"title":"通过iso 55001的现场评估,在pertamina hulu能源控股上游(phe shu)实施维护和可靠性管理系统(mrms)","authors":"Khairil Fikri, D. B. Darmadi, Deddy Nugraha","doi":"10.21776/jrm.v14i1.1589","DOIUrl":null,"url":null,"abstract":"As part of the integrated efforts that need to be made to achieve the target of becoming a world-class energy company, PHE SHU seeks to carry out the implementation of the Asset Integrity Management System (AIMS) and develop a MRMS which involves a solid team and is able to complete implementation in a timely, effective, efficient and highly competitive manner, to achieve a production target of 1 million bbl/day and 12 bcf/day in 2030 for national energy security referring to the international standard ISO 55001. MRMS is a reference for the governance of the reliability program and maintenance of production facility assets in the Upstream Subholding environment in the operational phase of the Pertamina Group asset management life cycle. identification of Failure Mode Effect Analysis (FMEA) preparation of maintenance strategy programs in the form of task selection for failure mode control based on studies in FMEA namely preparation of detection work programs in rotating equipment in the form of Predictive Maintenance (PdM) activities, task selection of detection programs in static equipment in the form of RBl activity. Task selection prevention in the form of Preventive Maintenance (PM) activities. Failure finding (function test), including determining time intervals for carrying out inspection activities for the PdM, RBI, PM, function test, ORDC (Operator Routine Duty Check List) programs based on the historical failure rate stated in PAREDA in ensuring that Upstream Oil and Gas Assets are optimized, sustainable, safe & reliable operations.","PeriodicalId":167086,"journal":{"name":"Jurnal Rekayasa Mesin","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-05-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"IMPLEMENTATION OF MAINTENANCE AND RELIABILITY MANAGEMENT SYSTEM (MRMS) IN PERTAMINA HULU ENERGY SUBHOLDING UPSTREAM (PHE SHU) THROUGH FIELD ASSESSMENT OF ISO 55001\",\"authors\":\"Khairil Fikri, D. B. Darmadi, Deddy Nugraha\",\"doi\":\"10.21776/jrm.v14i1.1589\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As part of the integrated efforts that need to be made to achieve the target of becoming a world-class energy company, PHE SHU seeks to carry out the implementation of the Asset Integrity Management System (AIMS) and develop a MRMS which involves a solid team and is able to complete implementation in a timely, effective, efficient and highly competitive manner, to achieve a production target of 1 million bbl/day and 12 bcf/day in 2030 for national energy security referring to the international standard ISO 55001. MRMS is a reference for the governance of the reliability program and maintenance of production facility assets in the Upstream Subholding environment in the operational phase of the Pertamina Group asset management life cycle. identification of Failure Mode Effect Analysis (FMEA) preparation of maintenance strategy programs in the form of task selection for failure mode control based on studies in FMEA namely preparation of detection work programs in rotating equipment in the form of Predictive Maintenance (PdM) activities, task selection of detection programs in static equipment in the form of RBl activity. Task selection prevention in the form of Preventive Maintenance (PM) activities. Failure finding (function test), including determining time intervals for carrying out inspection activities for the PdM, RBI, PM, function test, ORDC (Operator Routine Duty Check List) programs based on the historical failure rate stated in PAREDA in ensuring that Upstream Oil and Gas Assets are optimized, sustainable, safe & reliable operations.\",\"PeriodicalId\":167086,\"journal\":{\"name\":\"Jurnal Rekayasa Mesin\",\"volume\":\"33 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-05-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Rekayasa Mesin\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21776/jrm.v14i1.1589\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Rekayasa Mesin","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21776/jrm.v14i1.1589","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

作为实现成为世界一流能源公司目标的综合努力的一部分,PHE SHU寻求实施资产完整性管理系统(AIMS),并制定MRMS,这需要一个坚实的团队,能够及时,有效,高效和高度竞争的方式完成实施。根据国际标准ISO 55001,到2030年实现100万桶/天和120亿立方英尺/天的国家能源安全目标。在Pertamina集团资产管理生命周期的运营阶段,MRMS是上游子控股环境中可靠性计划治理和生产设施资产维护的参考。失效模式影响分析(FMEA)以任务选择的形式编制维修策略方案,在FMEA研究的基础上进行故障模式控制,即以预测性维修(PdM)活动的形式编制旋转设备的检测工作方案,以RBl活动的形式编制静态设备的检测方案。以预防性维护(PM)活动的形式进行任务选择预防。故障查找(功能测试),包括根据PAREDA中规定的历史故障率确定执行PdM、RBI、PM、功能测试、ORDC(操作员例行任务检查表)程序的检查活动的时间间隔,以确保上游油气资产的优化、可持续、安全和可靠运行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
IMPLEMENTATION OF MAINTENANCE AND RELIABILITY MANAGEMENT SYSTEM (MRMS) IN PERTAMINA HULU ENERGY SUBHOLDING UPSTREAM (PHE SHU) THROUGH FIELD ASSESSMENT OF ISO 55001
As part of the integrated efforts that need to be made to achieve the target of becoming a world-class energy company, PHE SHU seeks to carry out the implementation of the Asset Integrity Management System (AIMS) and develop a MRMS which involves a solid team and is able to complete implementation in a timely, effective, efficient and highly competitive manner, to achieve a production target of 1 million bbl/day and 12 bcf/day in 2030 for national energy security referring to the international standard ISO 55001. MRMS is a reference for the governance of the reliability program and maintenance of production facility assets in the Upstream Subholding environment in the operational phase of the Pertamina Group asset management life cycle. identification of Failure Mode Effect Analysis (FMEA) preparation of maintenance strategy programs in the form of task selection for failure mode control based on studies in FMEA namely preparation of detection work programs in rotating equipment in the form of Predictive Maintenance (PdM) activities, task selection of detection programs in static equipment in the form of RBl activity. Task selection prevention in the form of Preventive Maintenance (PM) activities. Failure finding (function test), including determining time intervals for carrying out inspection activities for the PdM, RBI, PM, function test, ORDC (Operator Routine Duty Check List) programs based on the historical failure rate stated in PAREDA in ensuring that Upstream Oil and Gas Assets are optimized, sustainable, safe & reliable operations.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信