弹性需求池市场下发电机/需求约束对市场出清价格的影响

S. Madhankumar, S. Prabhakar Karthikeyan, Atul Manmohan, Akhil Prasad
{"title":"弹性需求池市场下发电机/需求约束对市场出清价格的影响","authors":"S. Madhankumar, S. Prabhakar Karthikeyan, Atul Manmohan, Akhil Prasad","doi":"10.1109/NPEC.2018.8476710","DOIUrl":null,"url":null,"abstract":"In recent years, state electricity boards are getting transformed towards the restructuring process. It has brought lot of challenges in market environment. The main objective of deregulation is to provide competition and opens new choices to benefit the consumers. In this competitive environment, determination of Market Clearing Price (MCP) is the main aim of a pool operator. Its goal is to maximize the societal welfare function i.e. both Gencos’ and the Discos’ have to get benefited. In this paper, instead of taking stepped bid function from the generators and consumers, quadratic bid functions are taken as an input and the impact of MCP on generator limits has been investigated with and without losses.","PeriodicalId":170822,"journal":{"name":"2018 National Power Engineering Conference (NPEC)","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Impact of Generator/Demand Constraints on Market Clearing Price under Pool Market with Elastic Demand\",\"authors\":\"S. Madhankumar, S. Prabhakar Karthikeyan, Atul Manmohan, Akhil Prasad\",\"doi\":\"10.1109/NPEC.2018.8476710\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In recent years, state electricity boards are getting transformed towards the restructuring process. It has brought lot of challenges in market environment. The main objective of deregulation is to provide competition and opens new choices to benefit the consumers. In this competitive environment, determination of Market Clearing Price (MCP) is the main aim of a pool operator. Its goal is to maximize the societal welfare function i.e. both Gencos’ and the Discos’ have to get benefited. In this paper, instead of taking stepped bid function from the generators and consumers, quadratic bid functions are taken as an input and the impact of MCP on generator limits has been investigated with and without losses.\",\"PeriodicalId\":170822,\"journal\":{\"name\":\"2018 National Power Engineering Conference (NPEC)\",\"volume\":\"56 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 National Power Engineering Conference (NPEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/NPEC.2018.8476710\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 National Power Engineering Conference (NPEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/NPEC.2018.8476710","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

近年来,国家电力局正朝着重组的方向转型。它在市场环境中带来了许多挑战。放松管制的主要目的是提供竞争,并为消费者提供新的选择。在这种竞争环境下,确定市场出清价格(MCP)是池运营商的主要目标。其目标是最大化社会福利功能,即发电公司和迪斯科公司都必须从中受益。本文采用二次价函数作为输入,而不是从发电机组和用户处取阶价函数,研究了MCP对发电机组极限的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Impact of Generator/Demand Constraints on Market Clearing Price under Pool Market with Elastic Demand
In recent years, state electricity boards are getting transformed towards the restructuring process. It has brought lot of challenges in market environment. The main objective of deregulation is to provide competition and opens new choices to benefit the consumers. In this competitive environment, determination of Market Clearing Price (MCP) is the main aim of a pool operator. Its goal is to maximize the societal welfare function i.e. both Gencos’ and the Discos’ have to get benefited. In this paper, instead of taking stepped bid function from the generators and consumers, quadratic bid functions are taken as an input and the impact of MCP on generator limits has been investigated with and without losses.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信