{"title":"基于可视化仿真的南昌保税物流园区水电工程动态信息管理与控制方法","authors":"Zhijuan Deng, Shaojun Zhong","doi":"10.1109/ISISE.2010.123","DOIUrl":null,"url":null,"abstract":"The development of computer and system simulation technologies allows the dynamic process of water-power engineering to be simulated in real time on the computer, and the advanced visual method can reflects the simulation result by direct images. The reasons of deviation can be analyzed on the basis of comparison of estimation and plan, so as to provide the scientific, direct and high efficient information for decision-making in the engineering management, correct the plan and guarantee the engineering is completed successfully. For the water-power engineering of Nanchang Bonded Logistics Park, the paper has brought forward the dynamic management and control methods based on visual simulation for the water power engineering, and mainly researched the visual-simulation-based schedule control and real-time cost control.","PeriodicalId":206833,"journal":{"name":"2010 Third International Symposium on Information Science and Engineering","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Dynamic Information Management and Control Methods Based on Visual Simulation for Water-Power Engineering of Nanchang Bonded Logistics Park\",\"authors\":\"Zhijuan Deng, Shaojun Zhong\",\"doi\":\"10.1109/ISISE.2010.123\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The development of computer and system simulation technologies allows the dynamic process of water-power engineering to be simulated in real time on the computer, and the advanced visual method can reflects the simulation result by direct images. The reasons of deviation can be analyzed on the basis of comparison of estimation and plan, so as to provide the scientific, direct and high efficient information for decision-making in the engineering management, correct the plan and guarantee the engineering is completed successfully. For the water-power engineering of Nanchang Bonded Logistics Park, the paper has brought forward the dynamic management and control methods based on visual simulation for the water power engineering, and mainly researched the visual-simulation-based schedule control and real-time cost control.\",\"PeriodicalId\":206833,\"journal\":{\"name\":\"2010 Third International Symposium on Information Science and Engineering\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-12-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 Third International Symposium on Information Science and Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISISE.2010.123\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 Third International Symposium on Information Science and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISISE.2010.123","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Dynamic Information Management and Control Methods Based on Visual Simulation for Water-Power Engineering of Nanchang Bonded Logistics Park
The development of computer and system simulation technologies allows the dynamic process of water-power engineering to be simulated in real time on the computer, and the advanced visual method can reflects the simulation result by direct images. The reasons of deviation can be analyzed on the basis of comparison of estimation and plan, so as to provide the scientific, direct and high efficient information for decision-making in the engineering management, correct the plan and guarantee the engineering is completed successfully. For the water-power engineering of Nanchang Bonded Logistics Park, the paper has brought forward the dynamic management and control methods based on visual simulation for the water power engineering, and mainly researched the visual-simulation-based schedule control and real-time cost control.