巴西一家跨国金属机械工业的创新与生产管理:just in sequence战略

E. Dorion, J. Guimarães, E. Severo, Z. C. Reis, Pelayo Munhoz Olea
{"title":"巴西一家跨国金属机械工业的创新与生产管理:just in sequence战略","authors":"E. Dorion, J. Guimarães, E. Severo, Z. C. Reis, Pelayo Munhoz Olea","doi":"10.1109/ICMIT.2014.6942400","DOIUrl":null,"url":null,"abstract":"This study aims to describe the implementation of a project supply strategy, based on the Just in Sequence concepts; highlighting its difficulties and benefits. The case is described as a Brazilian metal-mechanic company that operates in the assembly of road transport and freight vehicles, being one of the market leaders in Brazil and around the world. The results show clear evidence that the new method presented difficulties related to the discipline of the employees in effectively using the JIS tool, however, it presents concrete innovations related to communication processes between the areas of production and stocks scheduling, as well as the reduction in inventories components within the production process, increasing the efficiency of the assembly line.","PeriodicalId":148200,"journal":{"name":"2014 IEEE International Conference on Management of Innovation and Technology","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-11-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":"{\"title\":\"Innovation and production management through a just in sequence strategy in a multinational Brazilian Metal-mechanic Industry\",\"authors\":\"E. Dorion, J. Guimarães, E. Severo, Z. C. Reis, Pelayo Munhoz Olea\",\"doi\":\"10.1109/ICMIT.2014.6942400\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study aims to describe the implementation of a project supply strategy, based on the Just in Sequence concepts; highlighting its difficulties and benefits. The case is described as a Brazilian metal-mechanic company that operates in the assembly of road transport and freight vehicles, being one of the market leaders in Brazil and around the world. The results show clear evidence that the new method presented difficulties related to the discipline of the employees in effectively using the JIS tool, however, it presents concrete innovations related to communication processes between the areas of production and stocks scheduling, as well as the reduction in inventories components within the production process, increasing the efficiency of the assembly line.\",\"PeriodicalId\":148200,\"journal\":{\"name\":\"2014 IEEE International Conference on Management of Innovation and Technology\",\"volume\":\"29 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-11-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"13\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 IEEE International Conference on Management of Innovation and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICMIT.2014.6942400\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE International Conference on Management of Innovation and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICMIT.2014.6942400","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13

摘要

本研究旨在描述项目供应策略的实施,基于Just in Sequence概念;突出其困难和好处。案例描述为一家巴西金属机械公司,从事公路运输和货运车辆的组装,是巴西乃至全球市场的领导者之一。结果清楚地表明,新方法在有效使用JIS工具的员工纪律方面存在困难,然而,它在生产和库存调度领域之间的沟通过程中提出了具体的创新,以及在生产过程中减少库存组件,提高装配线的效率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Innovation and production management through a just in sequence strategy in a multinational Brazilian Metal-mechanic Industry
This study aims to describe the implementation of a project supply strategy, based on the Just in Sequence concepts; highlighting its difficulties and benefits. The case is described as a Brazilian metal-mechanic company that operates in the assembly of road transport and freight vehicles, being one of the market leaders in Brazil and around the world. The results show clear evidence that the new method presented difficulties related to the discipline of the employees in effectively using the JIS tool, however, it presents concrete innovations related to communication processes between the areas of production and stocks scheduling, as well as the reduction in inventories components within the production process, increasing the efficiency of the assembly line.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信