工业设施和电厂高速客车自动换乘——理论与应用

C. Mozina
{"title":"工业设施和电厂高速客车自动换乘——理论与应用","authors":"C. Mozina","doi":"10.1109/CPRE.2006.1638699","DOIUrl":null,"url":null,"abstract":"This paper analyzes the motor bus transfer (MBT) issue and developing schemes to accomplish transfer that promote process continuity while causing no damage to the motors or the loads. An important value to decide the viability of MBT is the resultant volts per hertz (V/Hz). The resultant V/Hz issue is exacerbated when the phase angle difference increases and the voltage difference increases. Several methods have been proposed and discussed here","PeriodicalId":125883,"journal":{"name":"59th Annual Conference for Protective Relay Engineers, 2006.","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-04-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Automatic high-speed motor bus transfer at industrial facilities and power plants-theory and application\",\"authors\":\"C. Mozina\",\"doi\":\"10.1109/CPRE.2006.1638699\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper analyzes the motor bus transfer (MBT) issue and developing schemes to accomplish transfer that promote process continuity while causing no damage to the motors or the loads. An important value to decide the viability of MBT is the resultant volts per hertz (V/Hz). The resultant V/Hz issue is exacerbated when the phase angle difference increases and the voltage difference increases. Several methods have been proposed and discussed here\",\"PeriodicalId\":125883,\"journal\":{\"name\":\"59th Annual Conference for Protective Relay Engineers, 2006.\",\"volume\":\"28 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-04-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"59th Annual Conference for Protective Relay Engineers, 2006.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CPRE.2006.1638699\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"59th Annual Conference for Protective Relay Engineers, 2006.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CPRE.2006.1638699","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本文分析了母线转移(MBT)问题,并提出了在不损坏电机或负载的情况下实现过程连续性转移的方案。决定MBT可行性的一个重要值是每赫兹产生的伏特(V/Hz)。当相角差增大和电压差增大时,由此产生的V/Hz问题加剧。本文提出并讨论了几种方法
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Automatic high-speed motor bus transfer at industrial facilities and power plants-theory and application
This paper analyzes the motor bus transfer (MBT) issue and developing schemes to accomplish transfer that promote process continuity while causing no damage to the motors or the loads. An important value to decide the viability of MBT is the resultant volts per hertz (V/Hz). The resultant V/Hz issue is exacerbated when the phase angle difference increases and the voltage difference increases. Several methods have been proposed and discussed here
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信