{"title":"用改性木材组织生产输电电线杆的经济合理性","authors":"D. Parinov, I. Medvedev, V. Shamaev","doi":"10.34220/zeif2022_86-90","DOIUrl":null,"url":null,"abstract":"The tasks of organizing the production of power transmission poles from modified wood are divided into short-term and long-term. Short-term tasks include: attracting investments to create production; designing and manufacturing of the industrial plant SPK-5M and testing the technology of mass production of pillars with a length of 10.7 m; increasing the volume of production of poles from modified wood; creating additional jobs. The long-term tasks include: the organization of the production of power transmission poles from modified low-value hardwood according to the original technology; the introduction of the developed technology for the production of poles at an existing wood processing enterprise; mastering the supply of poles to the foreign market.","PeriodicalId":443253,"journal":{"name":"Materials of the international scientific and practical conference \"Green Economy: \"Iforest\"","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-02-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ECONOMIC JUSTIFICATION OF THE ORGANIZATION OF PRODUCTION OF POWER TRANSMISSION POLES FROM MODIFIED WOOD\",\"authors\":\"D. Parinov, I. Medvedev, V. Shamaev\",\"doi\":\"10.34220/zeif2022_86-90\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The tasks of organizing the production of power transmission poles from modified wood are divided into short-term and long-term. Short-term tasks include: attracting investments to create production; designing and manufacturing of the industrial plant SPK-5M and testing the technology of mass production of pillars with a length of 10.7 m; increasing the volume of production of poles from modified wood; creating additional jobs. The long-term tasks include: the organization of the production of power transmission poles from modified low-value hardwood according to the original technology; the introduction of the developed technology for the production of poles at an existing wood processing enterprise; mastering the supply of poles to the foreign market.\",\"PeriodicalId\":443253,\"journal\":{\"name\":\"Materials of the international scientific and practical conference \\\"Green Economy: \\\"Iforest\\\"\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-02-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Materials of the international scientific and practical conference \\\"Green Economy: \\\"Iforest\\\"\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.34220/zeif2022_86-90\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Materials of the international scientific and practical conference \"Green Economy: \"Iforest\"","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.34220/zeif2022_86-90","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

用改性木材组织生产输变电杆的任务分为短期和长期。短期任务包括:吸引投资以创造生产;SPK-5M工业厂房设计制造及10.7 m长柱量产工艺试验;增加用改性木材生产杆子的数量;创造更多的就业机会。长期任务包括:按原工艺组织用改性低价值硬木生产输变电杆;在现有木材加工企业引进先进技术生产木杆;掌握国外市场电线杆供应情况。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ECONOMIC JUSTIFICATION OF THE ORGANIZATION OF PRODUCTION OF POWER TRANSMISSION POLES FROM MODIFIED WOOD
The tasks of organizing the production of power transmission poles from modified wood are divided into short-term and long-term. Short-term tasks include: attracting investments to create production; designing and manufacturing of the industrial plant SPK-5M and testing the technology of mass production of pillars with a length of 10.7 m; increasing the volume of production of poles from modified wood; creating additional jobs. The long-term tasks include: the organization of the production of power transmission poles from modified low-value hardwood according to the original technology; the introduction of the developed technology for the production of poles at an existing wood processing enterprise; mastering the supply of poles to the foreign market.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信