{"title":"以过程为中心的软件编码工作分解结构,用于提高代码开发的估计准确性、资源负载和进度监控","authors":"Adnan Quaium, Ahmed Latif Shahriar, M. Rokonuzzaman","doi":"10.1109/ICCIT.2009.5407293","DOIUrl":null,"url":null,"abstract":"This study introduces process centric Work Breakdown Structure (WBS) for managing challenges for coding phase of software development cycle. The approach represents WBS as a process centric view to understand the inter relationships and dependencies between activities. Suggested WBS reduces complexities and gaps of the project plan and its execution by early simulation of diverse coding activities through process centric view. It is believed that such process centric approach instead of tree form representation of WBS will improve the visibility of coding process during planning stage for increasing the accuracy of estimation, resource loading, and progress monitoring.","PeriodicalId":443258,"journal":{"name":"2009 12th International Conference on Computers and Information Technology","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Process centric Work Breakdown Structure of software coding for improving accuracy of estimation, resource loading and progress monitoring of code development\",\"authors\":\"Adnan Quaium, Ahmed Latif Shahriar, M. Rokonuzzaman\",\"doi\":\"10.1109/ICCIT.2009.5407293\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study introduces process centric Work Breakdown Structure (WBS) for managing challenges for coding phase of software development cycle. The approach represents WBS as a process centric view to understand the inter relationships and dependencies between activities. Suggested WBS reduces complexities and gaps of the project plan and its execution by early simulation of diverse coding activities through process centric view. It is believed that such process centric approach instead of tree form representation of WBS will improve the visibility of coding process during planning stage for increasing the accuracy of estimation, resource loading, and progress monitoring.\",\"PeriodicalId\":443258,\"journal\":{\"name\":\"2009 12th International Conference on Computers and Information Technology\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 12th International Conference on Computers and Information Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICCIT.2009.5407293\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 12th International Conference on Computers and Information Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCIT.2009.5407293","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文介绍了以过程为中心的工作分解结构(WBS)来管理软件开发周期编码阶段的挑战。该方法将WBS表示为以过程为中心的视图,以理解活动之间的相互关系和依赖关系。建议的WBS通过以过程为中心的视图对各种编码活动进行早期模拟,从而减少了项目计划及其执行的复杂性和差距。这种以过程为中心的方法取代了WBS的树状表示法,可以提高编码过程在计划阶段的可见性,从而提高估计、资源加载和进度监控的准确性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Process centric Work Breakdown Structure of software coding for improving accuracy of estimation, resource loading and progress monitoring of code development
This study introduces process centric Work Breakdown Structure (WBS) for managing challenges for coding phase of software development cycle. The approach represents WBS as a process centric view to understand the inter relationships and dependencies between activities. Suggested WBS reduces complexities and gaps of the project plan and its execution by early simulation of diverse coding activities through process centric view. It is believed that such process centric approach instead of tree form representation of WBS will improve the visibility of coding process during planning stage for increasing the accuracy of estimation, resource loading, and progress monitoring.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信