{"title":"利用电子维修和数据分析改善维修计划系统的建议:个案研究","authors":"William Huaman, Fernando Garay, Wilmer Atoche","doi":"10.18687/laccei2022.1.1.661","DOIUrl":null,"url":null,"abstract":"This article proposes to optimize the planning process of the maintenance service of a company dedicated to the commercialization of analytical instruments using an E-maintenance strategy. The diagnosis was made using Power BI software, centralizing the information on work times in recent years, including the year 2020, an atypical year due to Covid-19. The efficiency of each collaborator and the direct work time indicator obtained were analyzed, allowing better decisions to be made in the work planning process. Power BI was chosen as the E-maintenance tool since it allows all the files and information generated by the after-sales staff to be in a centralized location. Likewise, the impact of the maintenance planning and programming process was analyzed, obtaining as a diagnosis that the personnel are dedicated 37.6% to direct work and 62.4% to non-direct work, which represents an efficiency of the man-hour cost of the 35%. Regarding the research methodology, it is of an application-experimental level. Achieving as estimated results in the proposal to improve the planning process;direct work time increased by 51% and non-direct work time decreased by 49%, which represents a man-hour cost efficiency of 49%. The case study concludes with the improvement of the planning process and therefore of staff productivityby36%. © 2022 Latin American and Caribbean Consortium of Engineering Institutions. All rights reserved.","PeriodicalId":373426,"journal":{"name":"Proceedings of the 20th LACCEI International Multi-Conference for Engineering, Education and Technology: “Education, Research and Leadership in Post-pandemic Engineering: Resilient, Inclusive and Sustainable Actions”","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Proposal for the Improvement of the Maintenance Planning System using E-maintenance and data analysis: Case Study\",\"authors\":\"William Huaman, Fernando Garay, Wilmer Atoche\",\"doi\":\"10.18687/laccei2022.1.1.661\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article proposes to optimize the planning process of the maintenance service of a company dedicated to the commercialization of analytical instruments using an E-maintenance strategy. The diagnosis was made using Power BI software, centralizing the information on work times in recent years, including the year 2020, an atypical year due to Covid-19. The efficiency of each collaborator and the direct work time indicator obtained were analyzed, allowing better decisions to be made in the work planning process. Power BI was chosen as the E-maintenance tool since it allows all the files and information generated by the after-sales staff to be in a centralized location. Likewise, the impact of the maintenance planning and programming process was analyzed, obtaining as a diagnosis that the personnel are dedicated 37.6% to direct work and 62.4% to non-direct work, which represents an efficiency of the man-hour cost of the 35%. Regarding the research methodology, it is of an application-experimental level. Achieving as estimated results in the proposal to improve the planning process;direct work time increased by 51% and non-direct work time decreased by 49%, which represents a man-hour cost efficiency of 49%. The case study concludes with the improvement of the planning process and therefore of staff productivityby36%. © 2022 Latin American and Caribbean Consortium of Engineering Institutions. All rights reserved.\",\"PeriodicalId\":373426,\"journal\":{\"name\":\"Proceedings of the 20th LACCEI International Multi-Conference for Engineering, Education and Technology: “Education, Research and Leadership in Post-pandemic Engineering: Resilient, Inclusive and Sustainable Actions”\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 20th LACCEI International Multi-Conference for Engineering, Education and Technology: “Education, Research and Leadership in Post-pandemic Engineering: Resilient, Inclusive and Sustainable Actions”\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.18687/laccei2022.1.1.661\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 20th LACCEI International Multi-Conference for Engineering, Education and Technology: “Education, Research and Leadership in Post-pandemic Engineering: Resilient, Inclusive and Sustainable Actions”","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18687/laccei2022.1.1.661","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0