Patrick Peeters, H. Brussel, P. Valckenaers, J. Wyns
{"title":"在车间系统开发阶段集成仿真的方法","authors":"Patrick Peeters, H. Brussel, P. Valckenaers, J. Wyns","doi":"10.1615/faim1999.640","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":127745,"journal":{"name":"Proceeding of Flexible Automation and Integrated Manufacturing 1999","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"METHODOLOGY TO INTEGRATE SIMULATION IN THE DEVELOPMENT PHASE OF SHOP FLOOR SYSTEMS\",\"authors\":\"Patrick Peeters, H. Brussel, P. Valckenaers, J. Wyns\",\"doi\":\"10.1615/faim1999.640\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":127745,\"journal\":{\"name\":\"Proceeding of Flexible Automation and Integrated Manufacturing 1999\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1999-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceeding of Flexible Automation and Integrated Manufacturing 1999\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1615/faim1999.640\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceeding of Flexible Automation and Integrated Manufacturing 1999","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1615/faim1999.640","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}