水力越小,风险越大

S. Pejovic, B. Karney, Q. Zhang, G. Kumar
{"title":"水力越小,风险越大","authors":"S. Pejovic, B. Karney, Q. Zhang, G. Kumar","doi":"10.1109/EPC.2007.4520312","DOIUrl":null,"url":null,"abstract":"Small or large hydropower plant design, construction and operation are complex tasks. Thousands of details must be well conceived and executed, and carefully coordinated for a project to achieve safe and economical operation that can be judged a social, technical and environmental success. Any hydroelectric installation, as a rule, should be designed using several stages. At each stage, all project documentation should be reviewed by independent reviewers selected and nominated by official authorities. Reducing the amount of analyses, without justification, or worse yet, neglecting the design procedures puts the project at risk. A collaborative effort at reducing this risk is thus advocated.","PeriodicalId":196861,"journal":{"name":"2007 IEEE Canada Electrical Power Conference","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"14","resultStr":"{\"title\":\"Smaller Hydro, Higher Risk\",\"authors\":\"S. Pejovic, B. Karney, Q. Zhang, G. Kumar\",\"doi\":\"10.1109/EPC.2007.4520312\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Small or large hydropower plant design, construction and operation are complex tasks. Thousands of details must be well conceived and executed, and carefully coordinated for a project to achieve safe and economical operation that can be judged a social, technical and environmental success. Any hydroelectric installation, as a rule, should be designed using several stages. At each stage, all project documentation should be reviewed by independent reviewers selected and nominated by official authorities. Reducing the amount of analyses, without justification, or worse yet, neglecting the design procedures puts the project at risk. A collaborative effort at reducing this risk is thus advocated.\",\"PeriodicalId\":196861,\"journal\":{\"name\":\"2007 IEEE Canada Electrical Power Conference\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"14\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2007 IEEE Canada Electrical Power Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EPC.2007.4520312\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 IEEE Canada Electrical Power Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPC.2007.4520312","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 14

摘要

小型或大型水电站的设计、建设和运行都是一项复杂的任务。成千上万的细节必须精心构思和执行,并仔细协调,以实现一个项目的安全和经济运行,可以判断为社会,技术和环境的成功。一般来说,任何水力发电装置都应采用几个阶段来设计。在每个阶段,所有项目文件都应由官方当局挑选和提名的独立审稿人进行审查。在没有证明的情况下减少分析的数量,或者更糟的是,忽略设计过程会使项目处于危险之中。因此,提倡合作减少这种风险。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Smaller Hydro, Higher Risk
Small or large hydropower plant design, construction and operation are complex tasks. Thousands of details must be well conceived and executed, and carefully coordinated for a project to achieve safe and economical operation that can be judged a social, technical and environmental success. Any hydroelectric installation, as a rule, should be designed using several stages. At each stage, all project documentation should be reviewed by independent reviewers selected and nominated by official authorities. Reducing the amount of analyses, without justification, or worse yet, neglecting the design procedures puts the project at risk. A collaborative effort at reducing this risk is thus advocated.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信