改进的同时可行性测试,以减轻FTR市场的收入不足

Rajes Rangarajan, Zongfei Wang
{"title":"改进的同时可行性测试,以减轻FTR市场的收入不足","authors":"Rajes Rangarajan, Zongfei Wang","doi":"10.1109/NAPS.2014.6965432","DOIUrl":null,"url":null,"abstract":"Financial transmission rights (FTRs) are financial instruments that aid participants in hedging against uncertainty in congestion cost. FTRs are funded by congestion rent from the physical market. ISOs ensure financial revenue adequacy by running a simultaneous feasibility test (SFT) to guarantee that available funds cover FTR payments. However, the ability of SFT to guarantee this revenue adequacy is contingent upon a static system topology. Consequently, topology changes in real time could cause revenue inadequacy. Past literature focuses on addressing this issue by policy modifications to real-time topology control. This paper attempts to resolve the revenue inadequacy issue by proposing modifications directly to the SFT.","PeriodicalId":421766,"journal":{"name":"2014 North American Power Symposium (NAPS)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-11-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"An improved simultaneous feasibility test to alleviate revenue inadequacy in FTR markets\",\"authors\":\"Rajes Rangarajan, Zongfei Wang\",\"doi\":\"10.1109/NAPS.2014.6965432\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Financial transmission rights (FTRs) are financial instruments that aid participants in hedging against uncertainty in congestion cost. FTRs are funded by congestion rent from the physical market. ISOs ensure financial revenue adequacy by running a simultaneous feasibility test (SFT) to guarantee that available funds cover FTR payments. However, the ability of SFT to guarantee this revenue adequacy is contingent upon a static system topology. Consequently, topology changes in real time could cause revenue inadequacy. Past literature focuses on addressing this issue by policy modifications to real-time topology control. This paper attempts to resolve the revenue inadequacy issue by proposing modifications directly to the SFT.\",\"PeriodicalId\":421766,\"journal\":{\"name\":\"2014 North American Power Symposium (NAPS)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-11-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 North American Power Symposium (NAPS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/NAPS.2014.6965432\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 North American Power Symposium (NAPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/NAPS.2014.6965432","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

金融传输权(ftr)是帮助参与者对冲拥堵成本不确定性的金融工具。ftr的资金来自实体市场的拥堵租金。iso通过同时进行可行性测试(SFT)来确保财政收入充足,以确保可用资金覆盖FTR支付。然而,SFT保证这种收入充分性的能力取决于静态系统拓扑结构。因此,实时拓扑变化可能导致收入不足。过去的文献着重于通过对实时拓扑控制的策略修改来解决这个问题。本文试图通过直接对SFT提出修改来解决收入不足问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An improved simultaneous feasibility test to alleviate revenue inadequacy in FTR markets
Financial transmission rights (FTRs) are financial instruments that aid participants in hedging against uncertainty in congestion cost. FTRs are funded by congestion rent from the physical market. ISOs ensure financial revenue adequacy by running a simultaneous feasibility test (SFT) to guarantee that available funds cover FTR payments. However, the ability of SFT to guarantee this revenue adequacy is contingent upon a static system topology. Consequently, topology changes in real time could cause revenue inadequacy. Past literature focuses on addressing this issue by policy modifications to real-time topology control. This paper attempts to resolve the revenue inadequacy issue by proposing modifications directly to the SFT.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信