Sulkifli Sulkifli, Dirgahayu Lantara, Muhammad Fachry Hafid
{"title":"基于可靠性中心维修(RCM)方法的bonregency Perkebunan Nusantara XIV Camming糖厂机器维修计划","authors":"Sulkifli Sulkifli, Dirgahayu Lantara, Muhammad Fachry Hafid","doi":"10.56953/jsiems.v1i1.9","DOIUrl":null,"url":null,"abstract":"Purpose: Frequent damage to the mill roll machine at the mill station and the absence of special attention to scheduling repairs, this research is expected to make scheduled maintenance intervals and maintenance strategies for mill roll machines at the mill station to reduce downtime and anticipate sudden downtime on the machine. \nDesign/methodology/approach: This study uses the Reliability Centered Maintenance (RCM) method approach to create the most efficient maintenance program by eliminating unnecessary maintenance activities, reducing overhaul frequency, minimizing downtime, minimizing the risk of sudden failure, focusing maintenance on critical components, and improving component reliability. \nFindings: The results of this study show that there are two strategies used in mill roll machine maintenance, namely preventive maintenance, and corrective maintenance. \nResearch limitations/implications: This study focuses on critical components that often experience damage to the mill roll machine, namely standard milk check, feeder roll, scrapper, and chute components, and does not consider the cost aspect. \nPractical implications: The results of this study provide input to the company's interval time scheduling and machine maintenance strategy. \nOriginality/value: This research was conducted in the production department of the milling station at PT Perkebunan Nusantara XIV Camming Sugar Factory in Bone Regency, where the production results include white crystal sugar, blotong, and molasses. Research to analyze machine reliability, minimize downtime and propose maintenance schedules and SOPs for maintaining production machinery at Camming Sugar Factory.","PeriodicalId":424225,"journal":{"name":"Journal of Sustainability Industrial Engineering and Management System","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Machine Maintenance Planning Using the Reliability Centered Maintenance (RCM) Method at PT Perkebunan Nusantara XIV Camming Sugar Factory in Bone Regency\",\"authors\":\"Sulkifli Sulkifli, Dirgahayu Lantara, Muhammad Fachry Hafid\",\"doi\":\"10.56953/jsiems.v1i1.9\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose: Frequent damage to the mill roll machine at the mill station and the absence of special attention to scheduling repairs, this research is expected to make scheduled maintenance intervals and maintenance strategies for mill roll machines at the mill station to reduce downtime and anticipate sudden downtime on the machine. \\nDesign/methodology/approach: This study uses the Reliability Centered Maintenance (RCM) method approach to create the most efficient maintenance program by eliminating unnecessary maintenance activities, reducing overhaul frequency, minimizing downtime, minimizing the risk of sudden failure, focusing maintenance on critical components, and improving component reliability. \\nFindings: The results of this study show that there are two strategies used in mill roll machine maintenance, namely preventive maintenance, and corrective maintenance. \\nResearch limitations/implications: This study focuses on critical components that often experience damage to the mill roll machine, namely standard milk check, feeder roll, scrapper, and chute components, and does not consider the cost aspect. \\nPractical implications: The results of this study provide input to the company's interval time scheduling and machine maintenance strategy. \\nOriginality/value: This research was conducted in the production department of the milling station at PT Perkebunan Nusantara XIV Camming Sugar Factory in Bone Regency, where the production results include white crystal sugar, blotong, and molasses. Research to analyze machine reliability, minimize downtime and propose maintenance schedules and SOPs for maintaining production machinery at Camming Sugar Factory.\",\"PeriodicalId\":424225,\"journal\":{\"name\":\"Journal of Sustainability Industrial Engineering and Management System\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Sustainability Industrial Engineering and Management System\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.56953/jsiems.v1i1.9\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Sustainability Industrial Engineering and Management System","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.56953/jsiems.v1i1.9","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
目的:针对磨站磨辊机损坏频繁且缺乏对计划维修的特别关注的问题,本研究旨在为磨站磨辊机制定计划维修间隔和维修策略,以减少停机时间,并预测机器的突然停机时间。设计/方法/方法:本研究采用以可靠性为中心的维护(RCM)方法,通过消除不必要的维护活动,减少大修频率,最大限度地减少停机时间,最大限度地降低突然故障的风险,将维护重点放在关键部件上,并提高部件可靠性,来创建最有效的维护计划。研究结果表明:轧辊机的维修策略主要有两种:预防性维修和纠正性维修。研究局限/影响:本研究侧重于磨辊机经常遭受损坏的关键部件,即标准牛奶检查,给料辊,刮板和溜槽部件,并没有考虑成本方面。实际意义:本研究的结果为公司的间隔时间安排和机器维修策略提供了参考。原创性/价值:本研究在Bone Regency的PT Perkebunan Nusantara XIV Camming糖厂的磨矿站生产部门进行,生产结果包括白色冰糖、blotong和糖蜜。研究分析机器的可靠性,最大限度地减少停机时间,并提出维护计划和标准操作程序,以维护康明糖厂的生产机器。
Machine Maintenance Planning Using the Reliability Centered Maintenance (RCM) Method at PT Perkebunan Nusantara XIV Camming Sugar Factory in Bone Regency
Purpose: Frequent damage to the mill roll machine at the mill station and the absence of special attention to scheduling repairs, this research is expected to make scheduled maintenance intervals and maintenance strategies for mill roll machines at the mill station to reduce downtime and anticipate sudden downtime on the machine.
Design/methodology/approach: This study uses the Reliability Centered Maintenance (RCM) method approach to create the most efficient maintenance program by eliminating unnecessary maintenance activities, reducing overhaul frequency, minimizing downtime, minimizing the risk of sudden failure, focusing maintenance on critical components, and improving component reliability.
Findings: The results of this study show that there are two strategies used in mill roll machine maintenance, namely preventive maintenance, and corrective maintenance.
Research limitations/implications: This study focuses on critical components that often experience damage to the mill roll machine, namely standard milk check, feeder roll, scrapper, and chute components, and does not consider the cost aspect.
Practical implications: The results of this study provide input to the company's interval time scheduling and machine maintenance strategy.
Originality/value: This research was conducted in the production department of the milling station at PT Perkebunan Nusantara XIV Camming Sugar Factory in Bone Regency, where the production results include white crystal sugar, blotong, and molasses. Research to analyze machine reliability, minimize downtime and propose maintenance schedules and SOPs for maintaining production machinery at Camming Sugar Factory.