苏加诺-哈达机场铁路项目电力消耗及成本影响分析

Indira Untari, Hizkia Sandhi Raharjo, Nayusrizal N, C. Hudaya
{"title":"苏加诺-哈达机场铁路项目电力消耗及成本影响分析","authors":"Indira Untari, Hizkia Sandhi Raharjo, Nayusrizal N, C. Hudaya","doi":"10.1109/ICPEA.2019.8818493","DOIUrl":null,"url":null,"abstract":"Soekarno-Hatta Airport Railink Project is one of the projects prioritized by the Government of Indonesia (GoI) in order to provide reliable mass transportation to and from Soekarno-Hatta International Airport. This research discusses electricity needs for the operation of Soekarno-Hatta Airport Railway and compared them to those of the existing substation. The availability of electric power became the most crucial aspect for the viability of the project and will depend on the capacity of substations that will sustain this train trip. It was assumed that Manggarai – Batu Ceper line will be integrated with other electric train service, which is Commuter Line, and this condition results in a clash as to their operation and electric power demand. Two separate services, two different companies, and two different types of train that use the same one line and substations are the focus of this research. This research examines the reliability of substations that already exist as well as the additional ones, if necessary. The findings of this research indicate that Karet and Manggarai substations require a slight additional capacity, but, overall, the existing substations remain reliable even though there will be an additional capacity in 2030 in order to maintain reliability in performing power supplies to two different services. It is calculated that the cost incurred if the capacity is added reaches USD 4.3 million. As for the cost of electricity, it is estimated that it ranges from USD 85,000 to USD 100,000/month for the first year with 89 trips per day.","PeriodicalId":427328,"journal":{"name":"2019 IEEE 2nd International Conference on Power and Energy Applications (ICPEA)","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Analysis of Electricity Power Consumption and Cost Impact of Soekarno-Hatta Airport Railink Project\",\"authors\":\"Indira Untari, Hizkia Sandhi Raharjo, Nayusrizal N, C. Hudaya\",\"doi\":\"10.1109/ICPEA.2019.8818493\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Soekarno-Hatta Airport Railink Project is one of the projects prioritized by the Government of Indonesia (GoI) in order to provide reliable mass transportation to and from Soekarno-Hatta International Airport. This research discusses electricity needs for the operation of Soekarno-Hatta Airport Railway and compared them to those of the existing substation. The availability of electric power became the most crucial aspect for the viability of the project and will depend on the capacity of substations that will sustain this train trip. It was assumed that Manggarai – Batu Ceper line will be integrated with other electric train service, which is Commuter Line, and this condition results in a clash as to their operation and electric power demand. Two separate services, two different companies, and two different types of train that use the same one line and substations are the focus of this research. This research examines the reliability of substations that already exist as well as the additional ones, if necessary. The findings of this research indicate that Karet and Manggarai substations require a slight additional capacity, but, overall, the existing substations remain reliable even though there will be an additional capacity in 2030 in order to maintain reliability in performing power supplies to two different services. It is calculated that the cost incurred if the capacity is added reaches USD 4.3 million. As for the cost of electricity, it is estimated that it ranges from USD 85,000 to USD 100,000/month for the first year with 89 trips per day.\",\"PeriodicalId\":427328,\"journal\":{\"name\":\"2019 IEEE 2nd International Conference on Power and Energy Applications (ICPEA)\",\"volume\":\"18 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 IEEE 2nd International Conference on Power and Energy Applications (ICPEA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICPEA.2019.8818493\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE 2nd International Conference on Power and Energy Applications (ICPEA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPEA.2019.8818493","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

苏加诺-哈达机场铁路项目是印度尼西亚政府优先考虑的项目之一,目的是提供往返苏加诺-哈达国际机场的可靠大规模运输。本研究探讨苏加诺-哈达机场铁路营运的电力需求,并与现有变电站的电力需求进行比较。电力供应已成为该项目可行性的最关键方面,并将取决于变电站的能力,以维持这趟列车的运行。假设Manggarai - Batu Ceper线将与其他电力列车服务,即通勤线整合,这种情况导致他们的运营和电力需求发生冲突。两种不同的服务,两家不同的公司,两种不同类型的列车使用同一条线路和变电站是本研究的重点。这项研究检查了已经存在的变电站以及必要时增加的变电站的可靠性。这项研究的结果表明,Karet和Manggarai变电站需要轻微的额外容量,但是,总体而言,即使在2030年将有额外的容量,为了保持向两种不同服务供电的可靠性,现有变电站仍然是可靠的。经计算,如果增加容量,产生的成本为430万美元。至于电费,预计第一年每月8.5万至10万美元,每天89次。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of Electricity Power Consumption and Cost Impact of Soekarno-Hatta Airport Railink Project
Soekarno-Hatta Airport Railink Project is one of the projects prioritized by the Government of Indonesia (GoI) in order to provide reliable mass transportation to and from Soekarno-Hatta International Airport. This research discusses electricity needs for the operation of Soekarno-Hatta Airport Railway and compared them to those of the existing substation. The availability of electric power became the most crucial aspect for the viability of the project and will depend on the capacity of substations that will sustain this train trip. It was assumed that Manggarai – Batu Ceper line will be integrated with other electric train service, which is Commuter Line, and this condition results in a clash as to their operation and electric power demand. Two separate services, two different companies, and two different types of train that use the same one line and substations are the focus of this research. This research examines the reliability of substations that already exist as well as the additional ones, if necessary. The findings of this research indicate that Karet and Manggarai substations require a slight additional capacity, but, overall, the existing substations remain reliable even though there will be an additional capacity in 2030 in order to maintain reliability in performing power supplies to two different services. It is calculated that the cost incurred if the capacity is added reaches USD 4.3 million. As for the cost of electricity, it is estimated that it ranges from USD 85,000 to USD 100,000/month for the first year with 89 trips per day.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信