{"title":"基于估计最小频率和功率亏缺的改进UFLS方案","authors":"Hassan Haes Alhelou, M. Golshan, R. Zamani, M. P. Moghaddam, Takawira Cuthbert Njenda, P. Siano, M. Marzband","doi":"10.1109/PTC.2019.8810497","DOIUrl":null,"url":null,"abstract":"In the event of a power system disturbance, it is important that the decision to implement under frequency load shedding is based on both the minimum frequency and the magnitude of the disturbance. In this paper, we propose the use of higher order polynomial curve fitting to estimate the minimum frequency. If the prediction shows that the minimum frequency threshold will be violated, the magnitude of the total disturbance is estimated using the swing equation. In addition, the minimum amount of load that must be shed to restore the frequency just above the minimum value can also be directly calculated. Simulations are carried out for the considered Taiwan power system and the results prove the efficiency of the proposed technique.","PeriodicalId":187144,"journal":{"name":"2019 IEEE Milan PowerTech","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-08-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"26","resultStr":"{\"title\":\"An Improved UFLS Scheme based on Estimated Minimum Frequency and Power Deficit\",\"authors\":\"Hassan Haes Alhelou, M. Golshan, R. Zamani, M. P. Moghaddam, Takawira Cuthbert Njenda, P. Siano, M. Marzband\",\"doi\":\"10.1109/PTC.2019.8810497\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the event of a power system disturbance, it is important that the decision to implement under frequency load shedding is based on both the minimum frequency and the magnitude of the disturbance. In this paper, we propose the use of higher order polynomial curve fitting to estimate the minimum frequency. If the prediction shows that the minimum frequency threshold will be violated, the magnitude of the total disturbance is estimated using the swing equation. In addition, the minimum amount of load that must be shed to restore the frequency just above the minimum value can also be directly calculated. Simulations are carried out for the considered Taiwan power system and the results prove the efficiency of the proposed technique.\",\"PeriodicalId\":187144,\"journal\":{\"name\":\"2019 IEEE Milan PowerTech\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-08-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"26\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 IEEE Milan PowerTech\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PTC.2019.8810497\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE Milan PowerTech","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PTC.2019.8810497","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 26

摘要

在发生电力系统扰动的情况下,基于最小频率和扰动的大小来决定是否实施低频减载是很重要的。在本文中,我们提出使用高阶多项式曲线拟合来估计最小频率。如果预测显示最小频率阈值将被打破,则使用摆幅方程估计总扰动的大小。此外,还可以直接计算恢复到刚好高于最小值的频率所需的最小负荷。对台湾电力系统进行了仿真,结果证明了该方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An Improved UFLS Scheme based on Estimated Minimum Frequency and Power Deficit
In the event of a power system disturbance, it is important that the decision to implement under frequency load shedding is based on both the minimum frequency and the magnitude of the disturbance. In this paper, we propose the use of higher order polynomial curve fitting to estimate the minimum frequency. If the prediction shows that the minimum frequency threshold will be violated, the magnitude of the total disturbance is estimated using the swing equation. In addition, the minimum amount of load that must be shed to restore the frequency just above the minimum value can also be directly calculated. Simulations are carried out for the considered Taiwan power system and the results prove the efficiency of the proposed technique.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信