数据集成-时间和规则依赖性

A. Thorsen
{"title":"数据集成-时间和规则依赖性","authors":"A. Thorsen","doi":"10.3997/2214-4609.201903302","DOIUrl":null,"url":null,"abstract":"Summary Focus on the matter of scale when placing wells and focusing on production. Typically there is some major focus areas during well placement, hence other are more in the background, although equally important. Points around time and changes to in-situ properties of the rock with production related changes. Use of information acquired at different times, often with years or decades apart, can play a major role in understanding reservoir dynamics.","PeriodicalId":427666,"journal":{"name":"Third EAGE Borehole Geology Workshop","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Data Integration - Time and Discipline Dependencies\",\"authors\":\"A. Thorsen\",\"doi\":\"10.3997/2214-4609.201903302\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Summary Focus on the matter of scale when placing wells and focusing on production. Typically there is some major focus areas during well placement, hence other are more in the background, although equally important. Points around time and changes to in-situ properties of the rock with production related changes. Use of information acquired at different times, often with years or decades apart, can play a major role in understanding reservoir dynamics.\",\"PeriodicalId\":427666,\"journal\":{\"name\":\"Third EAGE Borehole Geology Workshop\",\"volume\":\"5 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-10-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Third EAGE Borehole Geology Workshop\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3997/2214-4609.201903302\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Third EAGE Borehole Geology Workshop","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3997/2214-4609.201903302","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在下井和专注于生产时,要关注规模问题。通常情况下,在定位过程中会有一些主要的重点区域,因此其他区域虽然同样重要,但更多的是在背景中。与生产相关的岩石的原位性质的时间点和变化。利用在不同时间(通常间隔数年或数十年)获得的信息,可以在了解储层动态方面发挥重要作用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Data Integration - Time and Discipline Dependencies
Summary Focus on the matter of scale when placing wells and focusing on production. Typically there is some major focus areas during well placement, hence other are more in the background, although equally important. Points around time and changes to in-situ properties of the rock with production related changes. Use of information acquired at different times, often with years or decades apart, can play a major role in understanding reservoir dynamics.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信