{"title":"多路复用计算系统中的通信和输入/输出切换","authors":"J. F. Ossanna, L. Mikuš, S. Dunten","doi":"10.1145/1463891.1463916","DOIUrl":null,"url":null,"abstract":"This paper discusses the general communications and input/output switching problems in a large-scale multiplexed computing system. A basic goal of such a computing system is to serve simultaneously and continuously a wide range and large number of users. By rapidly time-multiplexing the use of computer system facilities on behalf of these users, the system attempts to satisfy the completion time and response time desires of both the on-line interactive user and the absentee user.","PeriodicalId":143723,"journal":{"name":"AFIPS '65 (Fall, part I)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1965-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"27","resultStr":"{\"title\":\"Communications and input/output switching in a multiplex computing system\",\"authors\":\"J. F. Ossanna, L. Mikuš, S. Dunten\",\"doi\":\"10.1145/1463891.1463916\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper discusses the general communications and input/output switching problems in a large-scale multiplexed computing system. A basic goal of such a computing system is to serve simultaneously and continuously a wide range and large number of users. By rapidly time-multiplexing the use of computer system facilities on behalf of these users, the system attempts to satisfy the completion time and response time desires of both the on-line interactive user and the absentee user.\",\"PeriodicalId\":143723,\"journal\":{\"name\":\"AFIPS '65 (Fall, part I)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1965-11-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"27\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"AFIPS '65 (Fall, part I)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/1463891.1463916\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"AFIPS '65 (Fall, part I)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/1463891.1463916","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Communications and input/output switching in a multiplex computing system
This paper discusses the general communications and input/output switching problems in a large-scale multiplexed computing system. A basic goal of such a computing system is to serve simultaneously and continuously a wide range and large number of users. By rapidly time-multiplexing the use of computer system facilities on behalf of these users, the system attempts to satisfy the completion time and response time desires of both the on-line interactive user and the absentee user.