执行新公共采购法第。2015年15日:纳米比亚地方当局(市)案例研究

Michael Ochurub, A. Jeremiah, Erna Ochurus
{"title":"执行新公共采购法第。2015年15日:纳米比亚地方当局(市)案例研究","authors":"Michael Ochurub, A. Jeremiah, Erna Ochurus","doi":"10.54421/njrst.v3i1.46","DOIUrl":null,"url":null,"abstract":"This paper articulates the implementation of new Public Procurement Act (No.15, 2015) in the Local Authorities (municipalities) in Namibia. This paper explores the concept of implementation with specific focus on how the decisions and plans based on the new procurement process were executed in practice within the Local Authorities in Namibia. Quantitative questionnaires were used and the numerical data obtained was analysed and presented in the form of numbers and statistics. The major findings of this paper show that the implementation process was not successful as the municipalities and its employees were not ready for the implementation of the new Public Procurement Act (No.15, 2015). The need for proper planning prior implementation was emphasized. It was found that key factors such as leadership and management aspects, communication, training of employees should be considered before implementation. This research adds great value as it addresses the need for a proper communication of the new system and leadership development to drive and manage the implementation process. The research also contributes to the body of existing knowledge as it alludes to people, as the most intangible components of readiness and when they are not ready, the results of implementation would be negative. Recommendations were made as outcomes of conclusions drawn from the data gathered during the research and are considered to have potential for improved and successful implementation of the new Public Procurement Act within the municipalities in Namibia.","PeriodicalId":314128,"journal":{"name":"Namibian Journal for Research, Science and Technology","volume":"146 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Implementation of the new public procurement Act no. 15, 2015: a case study of the local authorities (municipalities) in Namibia\",\"authors\":\"Michael Ochurub, A. Jeremiah, Erna Ochurus\",\"doi\":\"10.54421/njrst.v3i1.46\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper articulates the implementation of new Public Procurement Act (No.15, 2015) in the Local Authorities (municipalities) in Namibia. This paper explores the concept of implementation with specific focus on how the decisions and plans based on the new procurement process were executed in practice within the Local Authorities in Namibia. Quantitative questionnaires were used and the numerical data obtained was analysed and presented in the form of numbers and statistics. The major findings of this paper show that the implementation process was not successful as the municipalities and its employees were not ready for the implementation of the new Public Procurement Act (No.15, 2015). The need for proper planning prior implementation was emphasized. It was found that key factors such as leadership and management aspects, communication, training of employees should be considered before implementation. This research adds great value as it addresses the need for a proper communication of the new system and leadership development to drive and manage the implementation process. The research also contributes to the body of existing knowledge as it alludes to people, as the most intangible components of readiness and when they are not ready, the results of implementation would be negative. Recommendations were made as outcomes of conclusions drawn from the data gathered during the research and are considered to have potential for improved and successful implementation of the new Public Procurement Act within the municipalities in Namibia.\",\"PeriodicalId\":314128,\"journal\":{\"name\":\"Namibian Journal for Research, Science and Technology\",\"volume\":\"146 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-05-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Namibian Journal for Research, Science and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.54421/njrst.v3i1.46\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Namibian Journal for Research, Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54421/njrst.v3i1.46","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文阐述了纳米比亚地方当局(市)实施新的《公共采购法》(2015年第15号)的情况。本文探讨了执行的概念,特别侧重于纳米比亚地方当局如何在实践中执行基于新采购程序的决定和计划。采用定量调查问卷,对获得的数值数据进行分析,并以数字和统计的形式呈现。本文的主要发现表明,由于市政当局及其雇员没有准备好实施新的《公共采购法》(2015年第15号),实施过程并不成功。有人强调必须在执行前进行适当规划。发现在实施前应考虑领导和管理方面、沟通、员工培训等关键因素。这项研究增加了巨大的价值,因为它解决了新系统和领导力发展的适当沟通的需要,以推动和管理实施过程。这项研究也有助于现有的知识体系,因为它暗示人是准备的最无形的组成部分,当他们没有准备好时,实施的结果将是负面的。这些建议是根据研究期间收集的数据得出的结论而提出的,并被认为有可能在纳米比亚各市改进和成功地执行新的《公共采购法》。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Implementation of the new public procurement Act no. 15, 2015: a case study of the local authorities (municipalities) in Namibia
This paper articulates the implementation of new Public Procurement Act (No.15, 2015) in the Local Authorities (municipalities) in Namibia. This paper explores the concept of implementation with specific focus on how the decisions and plans based on the new procurement process were executed in practice within the Local Authorities in Namibia. Quantitative questionnaires were used and the numerical data obtained was analysed and presented in the form of numbers and statistics. The major findings of this paper show that the implementation process was not successful as the municipalities and its employees were not ready for the implementation of the new Public Procurement Act (No.15, 2015). The need for proper planning prior implementation was emphasized. It was found that key factors such as leadership and management aspects, communication, training of employees should be considered before implementation. This research adds great value as it addresses the need for a proper communication of the new system and leadership development to drive and manage the implementation process. The research also contributes to the body of existing knowledge as it alludes to people, as the most intangible components of readiness and when they are not ready, the results of implementation would be negative. Recommendations were made as outcomes of conclusions drawn from the data gathered during the research and are considered to have potential for improved and successful implementation of the new Public Procurement Act within the municipalities in Namibia.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信