评估香港公私合作项目的项目成功指数

R. Osei-Kyei, A. Chan
{"title":"评估香港公私合作项目的项目成功指数","authors":"R. Osei-Kyei, A. Chan","doi":"10.1108/CI-08-2017-0067","DOIUrl":null,"url":null,"abstract":"Purpose \n \n \n \n \nSince 1960, many public–private partnership (PPP) projects have been implemented in Hong Kong. Some projects have been considered as very successful, whereas others are seen as less successful. Unfortunately, these success outcomes have remained abstract because they are not in quantifiable terms. This paper aims to develop a model that can quantify the success outcome of PPP projects in Hong Kong. \n \n \n \n \nDesign/methodology/approach \n \n \n \n \nBoth quantitative and qualitative research approaches were adopted for the study. First, a questionnaire survey was conducted with PPP practitioners in Hong Kong, and thereafter, the fuzzy synthetic evaluation technique was used to develop a project success index for PPP projects in Hong Kong. The Hong Kong Cross-Harbour Tunnel project was used as a case study to demonstrate the applicability of the pragmatic model. \n \n \n \n \nFindings \n \n \n \n \nThe success index model developed consists of four unrelated success criteria groupings: cost effectiveness, quality of services and technical specification, environmental impact and long-term partnership. Further, the computed success index for the Cross-Harbour Tunnel project is 4.06, which indicates that the tunnel project has been highly successful. \n \n \n \n \nOriginality/value \n \n \n \n \nThe outputs of this study will enable PPP practitioners in Hong Kong to reliably evaluate the success levels of their projects. In addition, local practitioners can now compare the success levels of two or more PPP projects on the same basis.","PeriodicalId":221945,"journal":{"name":"Construction Innovation: Information, Process, Management","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-05-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"16","resultStr":"{\"title\":\"Evaluating the project success index of public-private partnership projects in Hong Kong\",\"authors\":\"R. Osei-Kyei, A. Chan\",\"doi\":\"10.1108/CI-08-2017-0067\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose \\n \\n \\n \\n \\nSince 1960, many public–private partnership (PPP) projects have been implemented in Hong Kong. Some projects have been considered as very successful, whereas others are seen as less successful. Unfortunately, these success outcomes have remained abstract because they are not in quantifiable terms. This paper aims to develop a model that can quantify the success outcome of PPP projects in Hong Kong. \\n \\n \\n \\n \\nDesign/methodology/approach \\n \\n \\n \\n \\nBoth quantitative and qualitative research approaches were adopted for the study. First, a questionnaire survey was conducted with PPP practitioners in Hong Kong, and thereafter, the fuzzy synthetic evaluation technique was used to develop a project success index for PPP projects in Hong Kong. The Hong Kong Cross-Harbour Tunnel project was used as a case study to demonstrate the applicability of the pragmatic model. \\n \\n \\n \\n \\nFindings \\n \\n \\n \\n \\nThe success index model developed consists of four unrelated success criteria groupings: cost effectiveness, quality of services and technical specification, environmental impact and long-term partnership. Further, the computed success index for the Cross-Harbour Tunnel project is 4.06, which indicates that the tunnel project has been highly successful. \\n \\n \\n \\n \\nOriginality/value \\n \\n \\n \\n \\nThe outputs of this study will enable PPP practitioners in Hong Kong to reliably evaluate the success levels of their projects. In addition, local practitioners can now compare the success levels of two or more PPP projects on the same basis.\",\"PeriodicalId\":221945,\"journal\":{\"name\":\"Construction Innovation: Information, Process, Management\",\"volume\":\"6 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-05-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"16\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Construction Innovation: Information, Process, Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/CI-08-2017-0067\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Innovation: Information, Process, Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/CI-08-2017-0067","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 16

摘要

自1960年以来,香港实施了许多公私合作项目。有些项目被认为非常成功,而另一些则被认为不太成功。不幸的是,这些成功的结果仍然是抽象的,因为它们无法量化。本文旨在建立一个模型,量化香港公私合作项目的成功成果。设计/方法/方法本研究采用了定量和定性两种研究方法。首先对香港PPP从业人员进行问卷调查,然后运用模糊综合评价技术制定香港PPP项目的项目成功指数。以香港海底隧道工程为例,论证了实用主义模型的适用性。成功指数模型由四个不相关的成功标准组组成:成本效益、服务质量和技术规范、环境影响和长期合作伙伴关系。此外,海底隧道工程的计算成功指数为4.06,表明该隧道工程非常成功。原创性/价值本研究的结果可让香港的公私合作伙伴关系实践者可靠地评估其项目的成功程度。此外,本地从业人员现在可以在同一基础上比较两个或多个PPP项目的成功水平。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Evaluating the project success index of public-private partnership projects in Hong Kong
Purpose Since 1960, many public–private partnership (PPP) projects have been implemented in Hong Kong. Some projects have been considered as very successful, whereas others are seen as less successful. Unfortunately, these success outcomes have remained abstract because they are not in quantifiable terms. This paper aims to develop a model that can quantify the success outcome of PPP projects in Hong Kong. Design/methodology/approach Both quantitative and qualitative research approaches were adopted for the study. First, a questionnaire survey was conducted with PPP practitioners in Hong Kong, and thereafter, the fuzzy synthetic evaluation technique was used to develop a project success index for PPP projects in Hong Kong. The Hong Kong Cross-Harbour Tunnel project was used as a case study to demonstrate the applicability of the pragmatic model. Findings The success index model developed consists of four unrelated success criteria groupings: cost effectiveness, quality of services and technical specification, environmental impact and long-term partnership. Further, the computed success index for the Cross-Harbour Tunnel project is 4.06, which indicates that the tunnel project has been highly successful. Originality/value The outputs of this study will enable PPP practitioners in Hong Kong to reliably evaluate the success levels of their projects. In addition, local practitioners can now compare the success levels of two or more PPP projects on the same basis.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信