Jiru Yang, Jin Yang, Ciwei Gao, Yang Cao, Wei Tian, Weiqing Ma, Zhiyi Jia
{"title":"全球能源互联网发展阶段划分","authors":"Jiru Yang, Jin Yang, Ciwei Gao, Yang Cao, Wei Tian, Weiqing Ma, Zhiyi Jia","doi":"10.1109/ICSAI.2017.8248328","DOIUrl":null,"url":null,"abstract":"The development of the global energy Internet can promote the effective allocation of resources. The division of the developmental stage of regional and national cross-border energy transactions will point out a developing direction. Therefore, this paper studies the division of developmental stages of the global energy Internet. This paper summarizes the evaluating indicators of the grid interconnection based on research data and analyzes key factors as characteristic indicators through the principal component analysis. Through clustering analysis, the global energy Internet is divided into six developmental stages, and the division model of developmental stages is established. Furthermore, the rising conditions of each stage is given.","PeriodicalId":285726,"journal":{"name":"2017 4th International Conference on Systems and Informatics (ICSAI)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The division of developmental stages of the global energy Internet\",\"authors\":\"Jiru Yang, Jin Yang, Ciwei Gao, Yang Cao, Wei Tian, Weiqing Ma, Zhiyi Jia\",\"doi\":\"10.1109/ICSAI.2017.8248328\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The development of the global energy Internet can promote the effective allocation of resources. The division of the developmental stage of regional and national cross-border energy transactions will point out a developing direction. Therefore, this paper studies the division of developmental stages of the global energy Internet. This paper summarizes the evaluating indicators of the grid interconnection based on research data and analyzes key factors as characteristic indicators through the principal component analysis. Through clustering analysis, the global energy Internet is divided into six developmental stages, and the division model of developmental stages is established. Furthermore, the rising conditions of each stage is given.\",\"PeriodicalId\":285726,\"journal\":{\"name\":\"2017 4th International Conference on Systems and Informatics (ICSAI)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 4th International Conference on Systems and Informatics (ICSAI)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICSAI.2017.8248328\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 4th International Conference on Systems and Informatics (ICSAI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSAI.2017.8248328","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The division of developmental stages of the global energy Internet
The development of the global energy Internet can promote the effective allocation of resources. The division of the developmental stage of regional and national cross-border energy transactions will point out a developing direction. Therefore, this paper studies the division of developmental stages of the global energy Internet. This paper summarizes the evaluating indicators of the grid interconnection based on research data and analyzes key factors as characteristic indicators through the principal component analysis. Through clustering analysis, the global energy Internet is divided into six developmental stages, and the division model of developmental stages is established. Furthermore, the rising conditions of each stage is given.