{"title":"SCADA/EMS系统集成技术与用户需求研究","authors":"T. Rahkonen, T. Cegrell","doi":"10.1109/PICA.1995.515207","DOIUrl":null,"url":null,"abstract":"Stating requirements on systems integration in a SCADA/EMS procurement project can be a delicate task, especially if a long-term strategy including integration with future systems is striven for. The problems are accentuated by the fact that in order to achieve a cost-efficient system utilities requirements have to be often stated, at least to some degree, with the SCADA/EMS vendors' \"standard\" systems in mind. This paper summarizes results from two state-of-the-practice studies, where among others, experienced SCADA/EMS users and vendors were investigated in terms of practical experiences from this field. The first study covered technical possibilities/problems in achieving systems integration; the focus of the second study was on specification of user requirements in industrial procurement projects. Based on the two studies, some common obstacles are recognized and some recommendations in how to state requirements on systems integration for a utility are given. The results should be of interest to utilities, vendors, and consultants in SCADA/EMS procurement projects.","PeriodicalId":294493,"journal":{"name":"Proceedings of Power Industry Computer Applications Conference","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"A study on techniques for and user requirements on systems integration in SCADA/EMS\",\"authors\":\"T. Rahkonen, T. Cegrell\",\"doi\":\"10.1109/PICA.1995.515207\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Stating requirements on systems integration in a SCADA/EMS procurement project can be a delicate task, especially if a long-term strategy including integration with future systems is striven for. The problems are accentuated by the fact that in order to achieve a cost-efficient system utilities requirements have to be often stated, at least to some degree, with the SCADA/EMS vendors' \\\"standard\\\" systems in mind. This paper summarizes results from two state-of-the-practice studies, where among others, experienced SCADA/EMS users and vendors were investigated in terms of practical experiences from this field. The first study covered technical possibilities/problems in achieving systems integration; the focus of the second study was on specification of user requirements in industrial procurement projects. Based on the two studies, some common obstacles are recognized and some recommendations in how to state requirements on systems integration for a utility are given. The results should be of interest to utilities, vendors, and consultants in SCADA/EMS procurement projects.\",\"PeriodicalId\":294493,\"journal\":{\"name\":\"Proceedings of Power Industry Computer Applications Conference\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1995-05-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of Power Industry Computer Applications Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PICA.1995.515207\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of Power Industry Computer Applications Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICA.1995.515207","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

在SCADA/EMS采购项目中,说明系统集成的需求可能是一项微妙的任务,特别是在争取与未来系统集成的长期战略时。为了实现具有成本效益的系统实用程序需求,必须经常(至少在某种程度上)考虑到SCADA/EMS供应商的“标准”系统,这一事实使问题更加突出。本文总结了两项实践研究的结果,其中调查了有经验的SCADA/EMS用户和供应商在该领域的实践经验。第一项研究涉及实现系统一体化的技术可能性/问题;第二项研究的重点是工业采购项目中用户需求的具体说明。在这两项研究的基础上,认识到一些常见的障碍,并提出了一些关于如何陈述公用事业系统集成需求的建议。结果应该对SCADA/EMS采购项目的公用事业、供应商和顾问感兴趣。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A study on techniques for and user requirements on systems integration in SCADA/EMS
Stating requirements on systems integration in a SCADA/EMS procurement project can be a delicate task, especially if a long-term strategy including integration with future systems is striven for. The problems are accentuated by the fact that in order to achieve a cost-efficient system utilities requirements have to be often stated, at least to some degree, with the SCADA/EMS vendors' "standard" systems in mind. This paper summarizes results from two state-of-the-practice studies, where among others, experienced SCADA/EMS users and vendors were investigated in terms of practical experiences from this field. The first study covered technical possibilities/problems in achieving systems integration; the focus of the second study was on specification of user requirements in industrial procurement projects. Based on the two studies, some common obstacles are recognized and some recommendations in how to state requirements on systems integration for a utility are given. The results should be of interest to utilities, vendors, and consultants in SCADA/EMS procurement projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信