基于完成率优雅退化的单处理器混合临界调度

Zhishan Guo, Kecheng Yang, Sudharsan Vaidhun, Samsil Arefin, Sajal K. Das, Haoyi Xiong
{"title":"基于完成率优雅退化的单处理器混合临界调度","authors":"Zhishan Guo, Kecheng Yang, Sudharsan Vaidhun, Samsil Arefin, Sajal K. Das, Haoyi Xiong","doi":"10.1109/RTSS.2018.00052","DOIUrl":null,"url":null,"abstract":"The scheduling of mixed-criticality (MC) systems with graceful degradation is considered, where LO-criticality tasks are guaranteed some service in HI mode in the form of minimum cumulative completion rates. First, we present an easy to implement admission-control procedure to determine which LO-criticality jobs to complete in HI mode. Then, we propose a demand-bound-function-based MC schedulability test that runs in pseudo-polynomial time for such systems under EDF-VD scheduling, wherein two virtual deadline setting heuristics are considered. Furthermore, we discuss a mechanism for the system to switch back from HI to LO mode and quantify the maximum time duration such recovery process would take. Finally, we show the effectiveness of our proposed method by experimental evaluation in comparison to state-of-the-art MC schedulers.","PeriodicalId":294784,"journal":{"name":"2018 IEEE Real-Time Systems Symposium (RTSS)","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"26","resultStr":"{\"title\":\"Uniprocessor Mixed-Criticality Scheduling with Graceful Degradation by Completion Rate\",\"authors\":\"Zhishan Guo, Kecheng Yang, Sudharsan Vaidhun, Samsil Arefin, Sajal K. Das, Haoyi Xiong\",\"doi\":\"10.1109/RTSS.2018.00052\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The scheduling of mixed-criticality (MC) systems with graceful degradation is considered, where LO-criticality tasks are guaranteed some service in HI mode in the form of minimum cumulative completion rates. First, we present an easy to implement admission-control procedure to determine which LO-criticality jobs to complete in HI mode. Then, we propose a demand-bound-function-based MC schedulability test that runs in pseudo-polynomial time for such systems under EDF-VD scheduling, wherein two virtual deadline setting heuristics are considered. Furthermore, we discuss a mechanism for the system to switch back from HI to LO mode and quantify the maximum time duration such recovery process would take. Finally, we show the effectiveness of our proposed method by experimental evaluation in comparison to state-of-the-art MC schedulers.\",\"PeriodicalId\":294784,\"journal\":{\"name\":\"2018 IEEE Real-Time Systems Symposium (RTSS)\",\"volume\":\"41 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"26\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE Real-Time Systems Symposium (RTSS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/RTSS.2018.00052\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE Real-Time Systems Symposium (RTSS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RTSS.2018.00052","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 26

摘要

考虑具有优雅退化的混合临界(MC)系统的调度问题,其中低临界任务以最小累积完成率的形式在HI模式下保证某些服务。首先,我们提出了一个易于实现的准入控制程序,以确定在HI模式下完成哪些低临界作业。然后,我们提出了一个基于需求约束函数的MC可调度性测试,该测试在EDF-VD调度下在伪多项式时间内运行,其中考虑了两个虚拟截止日期设置启发式。此外,我们还讨论了系统从HI模式切换回LO模式的机制,并量化了这种恢复过程所需的最大持续时间。最后,我们通过实验评估与最先进的MC调度程序进行了比较,证明了我们提出的方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Uniprocessor Mixed-Criticality Scheduling with Graceful Degradation by Completion Rate
The scheduling of mixed-criticality (MC) systems with graceful degradation is considered, where LO-criticality tasks are guaranteed some service in HI mode in the form of minimum cumulative completion rates. First, we present an easy to implement admission-control procedure to determine which LO-criticality jobs to complete in HI mode. Then, we propose a demand-bound-function-based MC schedulability test that runs in pseudo-polynomial time for such systems under EDF-VD scheduling, wherein two virtual deadline setting heuristics are considered. Furthermore, we discuss a mechanism for the system to switch back from HI to LO mode and quantify the maximum time duration such recovery process would take. Finally, we show the effectiveness of our proposed method by experimental evaluation in comparison to state-of-the-art MC schedulers.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信