S. J. Kazempour, A. Yousefi, K. Zare, M. P. Moghaddam, M. Haghifam, G. Yousefi
{"title":"能源调控市场下基于mip的抽水蓄能电站最优调度","authors":"S. J. Kazempour, A. Yousefi, K. Zare, M. P. Moghaddam, M. Haghifam, G. Yousefi","doi":"10.1109/UPEC.2008.4651465","DOIUrl":null,"url":null,"abstract":"This paper addresses the problem of optimal operation scheduling of an individual pumped-storage plant to participate in the energy and regulation markets simultaneously. The goal is achieving of the maximum expected profit when the plant participates in a day-ahead (DA) energy and regulation markets while all of the technical constraints are satisfied. This optimal operation scheduling problem is formulated and solved as a mixed integer programming (MIP) problem. Numerical results for a case study are discussed.","PeriodicalId":287461,"journal":{"name":"2008 43rd International Universities Power Engineering Conference","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-12-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"16","resultStr":"{\"title\":\"A MIP-based optimal operation scheduling of pumped-storage plant in the energy and regulation markets\",\"authors\":\"S. J. Kazempour, A. Yousefi, K. Zare, M. P. Moghaddam, M. Haghifam, G. Yousefi\",\"doi\":\"10.1109/UPEC.2008.4651465\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper addresses the problem of optimal operation scheduling of an individual pumped-storage plant to participate in the energy and regulation markets simultaneously. The goal is achieving of the maximum expected profit when the plant participates in a day-ahead (DA) energy and regulation markets while all of the technical constraints are satisfied. This optimal operation scheduling problem is formulated and solved as a mixed integer programming (MIP) problem. Numerical results for a case study are discussed.\",\"PeriodicalId\":287461,\"journal\":{\"name\":\"2008 43rd International Universities Power Engineering Conference\",\"volume\":\"11 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-12-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"16\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 43rd International Universities Power Engineering Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/UPEC.2008.4651465\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 43rd International Universities Power Engineering Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/UPEC.2008.4651465","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A MIP-based optimal operation scheduling of pumped-storage plant in the energy and regulation markets
This paper addresses the problem of optimal operation scheduling of an individual pumped-storage plant to participate in the energy and regulation markets simultaneously. The goal is achieving of the maximum expected profit when the plant participates in a day-ahead (DA) energy and regulation markets while all of the technical constraints are satisfied. This optimal operation scheduling problem is formulated and solved as a mixed integer programming (MIP) problem. Numerical results for a case study are discussed.