{"title":"公共项目的监督与效率:一个回归不连续分析","authors":"E. Calvo, Ruomeng Cui, J. C. Serpa","doi":"10.2139/ssrn.2876840","DOIUrl":null,"url":null,"abstract":"During the execution of a public project (e.g., the construction of a hospital), should regulators continually scrutinize the contractor’s operations? Or is this behavior obstructive? In this paper we explore the causal impact of government oversight on a project’s delay time and cost overrun. To this end, we collect a sample of 30,004 projects across 70 U.S. federal agencies and 5,557 private contractors. We exploit a regulatory bylaw in federal procurement. If a project’s estimated budget exceeds a pre-established cutoff, then the project’s operations are heavily scrutinized through evaluation teams, progress reports, and expenditure approval forms. If, conversely, a project’s budget is below this cutoff, these operational checks are waived. Using a regression discontinuity design, we find that decreasing the intensity of oversight significantly decreases a project’s delay time and cost overrun. Further, our results indicate that the effectiveness of government oversight depends on (i) the contract type and (ii) the contractor’s experience.","PeriodicalId":330590,"journal":{"name":"ERN: Procurement (Topic)","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"37","resultStr":"{\"title\":\"Oversight and Efficiency in Public Projects: A Regression Discontinuity Analysis\",\"authors\":\"E. Calvo, Ruomeng Cui, J. C. Serpa\",\"doi\":\"10.2139/ssrn.2876840\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"During the execution of a public project (e.g., the construction of a hospital), should regulators continually scrutinize the contractor’s operations? Or is this behavior obstructive? In this paper we explore the causal impact of government oversight on a project’s delay time and cost overrun. To this end, we collect a sample of 30,004 projects across 70 U.S. federal agencies and 5,557 private contractors. We exploit a regulatory bylaw in federal procurement. If a project’s estimated budget exceeds a pre-established cutoff, then the project’s operations are heavily scrutinized through evaluation teams, progress reports, and expenditure approval forms. If, conversely, a project’s budget is below this cutoff, these operational checks are waived. Using a regression discontinuity design, we find that decreasing the intensity of oversight significantly decreases a project’s delay time and cost overrun. Further, our results indicate that the effectiveness of government oversight depends on (i) the contract type and (ii) the contractor’s experience.\",\"PeriodicalId\":330590,\"journal\":{\"name\":\"ERN: Procurement (Topic)\",\"volume\":\"33 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"37\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ERN: Procurement (Topic)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.2876840\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ERN: Procurement (Topic)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.2876840","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Oversight and Efficiency in Public Projects: A Regression Discontinuity Analysis
During the execution of a public project (e.g., the construction of a hospital), should regulators continually scrutinize the contractor’s operations? Or is this behavior obstructive? In this paper we explore the causal impact of government oversight on a project’s delay time and cost overrun. To this end, we collect a sample of 30,004 projects across 70 U.S. federal agencies and 5,557 private contractors. We exploit a regulatory bylaw in federal procurement. If a project’s estimated budget exceeds a pre-established cutoff, then the project’s operations are heavily scrutinized through evaluation teams, progress reports, and expenditure approval forms. If, conversely, a project’s budget is below this cutoff, these operational checks are waived. Using a regression discontinuity design, we find that decreasing the intensity of oversight significantly decreases a project’s delay time and cost overrun. Further, our results indicate that the effectiveness of government oversight depends on (i) the contract type and (ii) the contractor’s experience.