{"title":"日惹市bantul区parangtritis kretek村sono (opak河)微水灌溉项目设计工程细节","authors":"A. Budiyanto","doi":"10.22146/ajse.v3i1.7137","DOIUrl":null,"url":null,"abstract":"Bantul  District  has  many  small  river  which  have the potency to  be  converted  to  electrical energy.  This  research  aims at  determination  the  potency  of  hydropower  and  designing  very low  head  water  power  plant.  The  observational  step  started  by measuring head and flow rate.  Designing of water turbine should be  considered  the  power  available.  Since  the  turbine  usually  run at low speed and the generator speed is quite high (1500 rpm) it require   speed  increaser.  Based  on  primary  data,  the electrical power can be generated up to  41.02  kilowatt kW  .The project’s objective is to provide the village Irrigation Sono (Opak river) Parangtritis with a  reliable,green clean  and  economically viable source of electrical energy. A potential  hydropower  site  in  the  vicinity  of  the  villages was identified at Opak river. The  salient  features  of  the  scheme  are  summarised  as follows: Gross Head (Hgross) 2- 3.5 m , Net Head ( Hnett)  2.5 m, Flow River 4,48 m3 /s, Design of flow rate (Q)  =2.5 m 3/s.  Electrical Power (Pelg) 61,31 KW. The project comprises of the following components: Water  intake  and  conveyance  structures,  including sand trap,  headrace  canal,  forebay, draft tube  and tailrace. Powerhouse, including protection wall  Generating  equipment, comprising  of  a  propeller turbine and synchronous generator  Electrical  turbine  control  system,  ELC  (Electronic Load Controller)  Transmission  facilities.The  implementation  of  the  project  will  take approximately six to eight months including the finalisation of  the  preparatory  work (detailed  design,  tendering, contract  awarding),  actual  implementation  of  the  project, testing, commissioning and training of operators.  Two villagers will be assigned and trained as operators for the operation and maintenance of the plant. In  order  to  optimize  the  viability  of  the  water source office of  Bantul, load management  is  deemed  necessary  to  optimise  the  supply and  demand  situation,  such  as  using  energy   pump for irrigation.","PeriodicalId":280593,"journal":{"name":"ASEAN Journal of Systems Engineering","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"DESIGN ENGINEERING DETAIL OF SONO (OPAK RIVER) MICROHYDRO IRRIGATION PROJECT PARANGTRITIS KRETEK VILLAGE IN THE DISTRICT OF BANTUL OF YOGYAKARTA\",\"authors\":\"A. Budiyanto\",\"doi\":\"10.22146/ajse.v3i1.7137\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Bantul  District  has  many  small  river  which  have the potency to  be  converted  to  electrical energy.  This  research  aims at  determination  the  potency  of  hydropower  and  designing  very low  head  water  power  plant.  The  observational  step  started  by measuring head and flow rate.  Designing of water turbine should be  considered  the  power  available.  Since  the  turbine  usually  run at low speed and the generator speed is quite high (1500 rpm) it require   speed  increaser.  Based  on  primary  data,  the electrical power can be generated up to  41.02  kilowatt kW  .The project’s objective is to provide the village Irrigation Sono (Opak river) Parangtritis with a  reliable,green clean  and  economically viable source of electrical energy. A potential  hydropower  site  in  the  vicinity  of  the  villages was identified at Opak river. The  salient  features  of  the  scheme  are  summarised  as follows: Gross Head (Hgross) 2- 3.5 m , Net Head ( Hnett)  2.5 m, Flow River 4,48 m3 /s, Design of flow rate (Q)  =2.5 m 3/s.  Electrical Power (Pelg) 61,31 KW. The project comprises of the following components: Water  intake  and  conveyance  structures,  including sand trap,  headrace  canal,  forebay, draft tube  and tailrace. Powerhouse, including protection wall  Generating  equipment, comprising  of  a  propeller turbine and synchronous generator  Electrical  turbine  control  system,  ELC  (Electronic Load Controller)  Transmission  facilities.The  implementation  of  the  project  will  take approximately six to eight months including the finalisation of  the  preparatory  work (detailed  design,  tendering, contract  awarding),  actual  implementation  of  the  project, testing, commissioning and training of operators.  Two villagers will be assigned and trained as operators for the operation and maintenance of the plant. In  order  to  optimize  the  viability  of  the  water source office of  Bantul, load management  is  deemed  necessary  to  optimise  the  supply and  demand  situation,  such  as  using  energy   pump for irrigation.\",\"PeriodicalId\":280593,\"journal\":{\"name\":\"ASEAN Journal of Systems Engineering\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-07-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ASEAN Journal of Systems Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22146/ajse.v3i1.7137\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ASEAN Journal of Systems Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22146/ajse.v3i1.7137","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

班图尔地区有许多小河流,这些河流具有转化为电能的潜力。本研究旨在确定水力发电的潜力,设计极低水头电站。观察步骤从测量水头和流量开始。水轮机的设计应考虑可用功率。由于涡轮机通常以低速运行,而发电机转速相当高(1500转/分),因此需要增加转速。根据初步数据,该项目可产生高达41.02千瓦的电力。该项目的目标是为村庄灌溉Sono (Opak河)Parangtritis提供可靠,绿色清洁和经济可行的电力来源。在村庄附近的奥帕克河确定了一个潜在的水力发电地点。方案的主要特点总结如下:总水头(Hgross) 2- 3.5 m,净水头(Hnett) 2.5 m,流量河4,48 m3 /s,设计流量(Q) =2.5 m3 /s。电力(Pelg) 61,31 KW。该项目由以下部分组成:取水和输送结构,包括沙池、引水渠、前湾、尾水管和尾水管。厂房,包括防护墙发电设备,包括螺旋桨水轮机和同步发电机,水轮机电气控制系统,ELC(电子负荷控制器)传输设施。该项目的实施将需要大约6至8个月的时间,包括完成准备工作(详细设计、招标、授予合同)、项目的实际实施、测试、调试和操作员的培训。将指派和培训两名村民作为操作和维护该工厂的操作员。为了优化班图尔水源办公室的生存能力,负荷管理被认为是必要的,以优化供需情况,例如使用能源泵进行灌溉。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
DESIGN ENGINEERING DETAIL OF SONO (OPAK RIVER) MICROHYDRO IRRIGATION PROJECT PARANGTRITIS KRETEK VILLAGE IN THE DISTRICT OF BANTUL OF YOGYAKARTA
Bantul  District  has  many  small  river  which  have the potency to  be  converted  to  electrical energy.  This  research  aims at  determination  the  potency  of  hydropower  and  designing  very low  head  water  power  plant.  The  observational  step  started  by measuring head and flow rate.  Designing of water turbine should be  considered  the  power  available.  Since  the  turbine  usually  run at low speed and the generator speed is quite high (1500 rpm) it require   speed  increaser.  Based  on  primary  data,  the electrical power can be generated up to  41.02  kilowatt kW  .The project’s objective is to provide the village Irrigation Sono (Opak river) Parangtritis with a  reliable,green clean  and  economically viable source of electrical energy. A potential  hydropower  site  in  the  vicinity  of  the  villages was identified at Opak river. The  salient  features  of  the  scheme  are  summarised  as follows: Gross Head (Hgross) 2- 3.5 m , Net Head ( Hnett)  2.5 m, Flow River 4,48 m3 /s, Design of flow rate (Q)  =2.5 m 3/s.  Electrical Power (Pelg) 61,31 KW. The project comprises of the following components: Water  intake  and  conveyance  structures,  including sand trap,  headrace  canal,  forebay, draft tube  and tailrace. Powerhouse, including protection wall  Generating  equipment, comprising  of  a  propeller turbine and synchronous generator  Electrical  turbine  control  system,  ELC  (Electronic Load Controller)  Transmission  facilities.The  implementation  of  the  project  will  take approximately six to eight months including the finalisation of  the  preparatory  work (detailed  design,  tendering, contract  awarding),  actual  implementation  of  the  project, testing, commissioning and training of operators.  Two villagers will be assigned and trained as operators for the operation and maintenance of the plant. In  order  to  optimize  the  viability  of  the  water source office of  Bantul, load management  is  deemed  necessary  to  optimise  the  supply and  demand  situation,  such  as  using  energy   pump for irrigation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信