{"title":"基于地理信息系统的洪水灾害评估与决策支持:以尼日利亚阿夸伊博姆州乌约首府为例","authors":"U. Ituen, Imoh Johnson, N. Nyah","doi":"10.18488/journal.10/2014.3.4/10.4.56.67","DOIUrl":null,"url":null,"abstract":"The study aimed at assessing flood prone areas in Uyo Capital City with a view to suggesting control measures. It used 2008 NigerSat imagery, soil texture, rainfall, and road network data of Uyo. With Multi-criteria evaluation technique, the use of Geographic Information Systems (GIS), Global Positioning System (GPS), Digital Elevation Model (DEM) and single output map algebra were employed to generate flood hazard map of Uyo. The DEM was used to generate contours, terrain elevation, slope, and aspect surfaces, where aspect provided the direction of slope that contributed to flood inundation. Flood mapping was done to determine flood locations based on a 3D terrain assessment while flood hazard assessment formed the basis for flood control in the area. From the result of the study, flood hazard areas in Uyo Capital City were identified and classified into high, moderate, and low hazard zones. Based on this classification however, flood control measures have also been rated as critical, less critical, and non-critical respectively. Out of the 25 flood locations captured during the 2012 flash flood event, twelve locations were found on the critical control zones while thirteen were found on the less critical control zones. Based on the findings from this study, it was however suggested that town planners, construction companies and individuals should work in consultation with Geographers, Hydrologists and other stakeholders in the field who have adequate knowledge of the terrain and the technical ability in flood hazard modeling. Additionally, non-structural flood control measures have also been strongly advocated for implementation in the capital city of Uyo.","PeriodicalId":281124,"journal":{"name":"International Journal of Geography and Geology","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Flood Hazard Assessment and Decisions Support Using Geographic Information System: A Case Study of Uyo Capital City, Akwa Ibom State, Nigeria\",\"authors\":\"U. Ituen, Imoh Johnson, N. Nyah\",\"doi\":\"10.18488/journal.10/2014.3.4/10.4.56.67\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The study aimed at assessing flood prone areas in Uyo Capital City with a view to suggesting control measures. It used 2008 NigerSat imagery, soil texture, rainfall, and road network data of Uyo. With Multi-criteria evaluation technique, the use of Geographic Information Systems (GIS), Global Positioning System (GPS), Digital Elevation Model (DEM) and single output map algebra were employed to generate flood hazard map of Uyo. The DEM was used to generate contours, terrain elevation, slope, and aspect surfaces, where aspect provided the direction of slope that contributed to flood inundation. Flood mapping was done to determine flood locations based on a 3D terrain assessment while flood hazard assessment formed the basis for flood control in the area. From the result of the study, flood hazard areas in Uyo Capital City were identified and classified into high, moderate, and low hazard zones. Based on this classification however, flood control measures have also been rated as critical, less critical, and non-critical respectively. Out of the 25 flood locations captured during the 2012 flash flood event, twelve locations were found on the critical control zones while thirteen were found on the less critical control zones. Based on the findings from this study, it was however suggested that town planners, construction companies and individuals should work in consultation with Geographers, Hydrologists and other stakeholders in the field who have adequate knowledge of the terrain and the technical ability in flood hazard modeling. Additionally, non-structural flood control measures have also been strongly advocated for implementation in the capital city of Uyo.\",\"PeriodicalId\":281124,\"journal\":{\"name\":\"International Journal of Geography and Geology\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-04-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Geography and Geology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.18488/journal.10/2014.3.4/10.4.56.67\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Geography and Geology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18488/journal.10/2014.3.4/10.4.56.67","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

该研究旨在评估首都尤尤市的洪水易发地区,以期提出控制措施。它使用了2008年的尼日利亚卫星图像、土壤质地、降雨量和尤尤的道路网络数据。采用多准则评价技术,利用地理信息系统(GIS)、全球定位系统(GPS)、数字高程模型(DEM)和单输出地图代数,生成了Uyo洪涝灾害图。DEM用于生成等高线、地形高程、坡度和坡向面,其中坡向提供了导致洪水淹没的坡度方向。洪水测绘是根据三维地形评估来确定洪水位置,而洪水危害评估则是该地区防洪的基础。根据研究结果,确定了首都尤约市的洪水危险区,并将其划分为高、中、低危险区。然而,基于这一分类,防洪措施也分别被评为关键、不太关键和非关键。在2012年山洪暴发期间捕获的25个洪水地点中,有12个地点位于关键控制区,而13个地点位于不那么关键的控制区。然而,根据这项研究的结果,建议城市规划者、建筑公司和个人应该与地理学家、水文学家和该领域的其他利益相关者协商,他们对地形有足够的了解,并具有洪水灾害建模的技术能力。此外,非结构性防洪措施也被大力提倡在首都尤约实施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Flood Hazard Assessment and Decisions Support Using Geographic Information System: A Case Study of Uyo Capital City, Akwa Ibom State, Nigeria
The study aimed at assessing flood prone areas in Uyo Capital City with a view to suggesting control measures. It used 2008 NigerSat imagery, soil texture, rainfall, and road network data of Uyo. With Multi-criteria evaluation technique, the use of Geographic Information Systems (GIS), Global Positioning System (GPS), Digital Elevation Model (DEM) and single output map algebra were employed to generate flood hazard map of Uyo. The DEM was used to generate contours, terrain elevation, slope, and aspect surfaces, where aspect provided the direction of slope that contributed to flood inundation. Flood mapping was done to determine flood locations based on a 3D terrain assessment while flood hazard assessment formed the basis for flood control in the area. From the result of the study, flood hazard areas in Uyo Capital City were identified and classified into high, moderate, and low hazard zones. Based on this classification however, flood control measures have also been rated as critical, less critical, and non-critical respectively. Out of the 25 flood locations captured during the 2012 flash flood event, twelve locations were found on the critical control zones while thirteen were found on the less critical control zones. Based on the findings from this study, it was however suggested that town planners, construction companies and individuals should work in consultation with Geographers, Hydrologists and other stakeholders in the field who have adequate knowledge of the terrain and the technical ability in flood hazard modeling. Additionally, non-structural flood control measures have also been strongly advocated for implementation in the capital city of Uyo.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信