采用模糊比较评判法选择承包商

R. Alias, N. M. M. Noor, Md. Yazid Mohd. Saman, M. Abdullah, A. Selamat
{"title":"采用模糊比较评判法选择承包商","authors":"R. Alias, N. M. M. Noor, Md. Yazid Mohd. Saman, M. Abdullah, A. Selamat","doi":"10.1109/MYSEC.2011.6140703","DOIUrl":null,"url":null,"abstract":"A model is proposed for selecting the optimal result of contractor selection under multi criteria environment. Fuzzy comparing judgment is used to tackling the vagueness and uncertainty in choosing significant preferences by decision maker regarding to the subjective opinion. Finally, the model was tested in tender evaluation processes for awarding the most beneficial contractor to perform the construction project.","PeriodicalId":137714,"journal":{"name":"2011 Malaysian Conference in Software Engineering","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Contractor selection using fuzzy comparison judgement\",\"authors\":\"R. Alias, N. M. M. Noor, Md. Yazid Mohd. Saman, M. Abdullah, A. Selamat\",\"doi\":\"10.1109/MYSEC.2011.6140703\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A model is proposed for selecting the optimal result of contractor selection under multi criteria environment. Fuzzy comparing judgment is used to tackling the vagueness and uncertainty in choosing significant preferences by decision maker regarding to the subjective opinion. Finally, the model was tested in tender evaluation processes for awarding the most beneficial contractor to perform the construction project.\",\"PeriodicalId\":137714,\"journal\":{\"name\":\"2011 Malaysian Conference in Software Engineering\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 Malaysian Conference in Software Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/MYSEC.2011.6140703\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 Malaysian Conference in Software Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MYSEC.2011.6140703","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

提出了一个多准则环境下承包商选择最优结果的选择模型。模糊比较判断是为了解决决策者根据主观意见选择重要偏好时的模糊性和不确定性。最后,在评标过程中对该模型进行了测试,以确定最有利的承包商来执行建设项目。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Contractor selection using fuzzy comparison judgement
A model is proposed for selecting the optimal result of contractor selection under multi criteria environment. Fuzzy comparing judgment is used to tackling the vagueness and uncertainty in choosing significant preferences by decision maker regarding to the subjective opinion. Finally, the model was tested in tender evaluation processes for awarding the most beneficial contractor to perform the construction project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信