{"title":"锂离子电池装配线的生产线末端测试和成型工艺","authors":"M. Wolter, G. Fauser, C. Bretthauer, M. Roscher","doi":"10.1109/SSD.2012.6198092","DOIUrl":null,"url":null,"abstract":"The large-scale production of large-format Li-ion batteries is a challenging topic for suppliers of materials and components as well as for manufacturers of battery cells. Particularly, the formation and electrical testing of individual battery cells - the last steps of the production line - are identified as a significant bottleneck for mass production. Thus, detailed studies on end-of-line testing and formation were carried out to develop efficient test procedures and parameter extraction regarding cell quality monitoring.","PeriodicalId":425823,"journal":{"name":"International Multi-Conference on Systems, Sygnals & Devices","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-03-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"21","resultStr":"{\"title\":\"End-of-line testing and formation process in Li-ion battery assembly lines\",\"authors\":\"M. Wolter, G. Fauser, C. Bretthauer, M. Roscher\",\"doi\":\"10.1109/SSD.2012.6198092\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The large-scale production of large-format Li-ion batteries is a challenging topic for suppliers of materials and components as well as for manufacturers of battery cells. Particularly, the formation and electrical testing of individual battery cells - the last steps of the production line - are identified as a significant bottleneck for mass production. Thus, detailed studies on end-of-line testing and formation were carried out to develop efficient test procedures and parameter extraction regarding cell quality monitoring.\",\"PeriodicalId\":425823,\"journal\":{\"name\":\"International Multi-Conference on Systems, Sygnals & Devices\",\"volume\":\"32 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-03-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"21\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Multi-Conference on Systems, Sygnals & Devices\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SSD.2012.6198092\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Multi-Conference on Systems, Sygnals & Devices","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SSD.2012.6198092","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
End-of-line testing and formation process in Li-ion battery assembly lines
The large-scale production of large-format Li-ion batteries is a challenging topic for suppliers of materials and components as well as for manufacturers of battery cells. Particularly, the formation and electrical testing of individual battery cells - the last steps of the production line - are identified as a significant bottleneck for mass production. Thus, detailed studies on end-of-line testing and formation were carried out to develop efficient test procedures and parameter extraction regarding cell quality monitoring.