单塔斜拉桥的积分计算

Yaqin Chen, Jingwen Li
{"title":"单塔斜拉桥的积分计算","authors":"Yaqin Chen, Jingwen Li","doi":"10.1109/icvris.2018.00052","DOIUrl":null,"url":null,"abstract":"In this paper, the actual project of cable-stayed bridge with single pylon is taken as the calculation object. This bridge has main span of 2 × 132m, and it is tower-girder consolidation system. The finite element model is established using Midas/civil software to calculate and analyze the bridge's behavior in construction and service status. The calculation includes the force calculation of the main girder, the central pylon and cables; also includes cracking resistance and stiffness checking computation of main girder in the serviceability limit state, the stress checking computation of the main girder, the central pylon and stay-cables also in the serviceability limit state. Calculations results prove that the bridge's static force performance meets the specification requirements both in the construction and service status. So it can provide a reference for the design scheme selection and calculation analysis of similar bridges.","PeriodicalId":152317,"journal":{"name":"2018 International Conference on Virtual Reality and Intelligent Systems (ICVRIS)","volume":"743 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Integral Calculation of a Cable-Stayed Bridge with Single Pylon\",\"authors\":\"Yaqin Chen, Jingwen Li\",\"doi\":\"10.1109/icvris.2018.00052\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, the actual project of cable-stayed bridge with single pylon is taken as the calculation object. This bridge has main span of 2 × 132m, and it is tower-girder consolidation system. The finite element model is established using Midas/civil software to calculate and analyze the bridge's behavior in construction and service status. The calculation includes the force calculation of the main girder, the central pylon and cables; also includes cracking resistance and stiffness checking computation of main girder in the serviceability limit state, the stress checking computation of the main girder, the central pylon and stay-cables also in the serviceability limit state. Calculations results prove that the bridge's static force performance meets the specification requirements both in the construction and service status. So it can provide a reference for the design scheme selection and calculation analysis of similar bridges.\",\"PeriodicalId\":152317,\"journal\":{\"name\":\"2018 International Conference on Virtual Reality and Intelligent Systems (ICVRIS)\",\"volume\":\"743 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 International Conference on Virtual Reality and Intelligent Systems (ICVRIS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/icvris.2018.00052\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 International Conference on Virtual Reality and Intelligent Systems (ICVRIS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/icvris.2018.00052","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文以单塔斜拉桥的实际工程为计算对象。该桥主跨2 × 132米,为塔梁加固体系。利用Midas/civil软件建立有限元模型,对桥梁的施工行为和使用状态进行了计算和分析。计算包括主梁、中心塔和索的受力计算;还包括主梁在使用极限状态下的抗裂刚度验算,主梁、中心塔和斜拉索在使用极限状态下的应力验算。计算结果表明,该桥在施工和使用状态下的静力性能均满足规范要求。可为同类桥梁的设计方案选择和计算分析提供参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Integral Calculation of a Cable-Stayed Bridge with Single Pylon
In this paper, the actual project of cable-stayed bridge with single pylon is taken as the calculation object. This bridge has main span of 2 × 132m, and it is tower-girder consolidation system. The finite element model is established using Midas/civil software to calculate and analyze the bridge's behavior in construction and service status. The calculation includes the force calculation of the main girder, the central pylon and cables; also includes cracking resistance and stiffness checking computation of main girder in the serviceability limit state, the stress checking computation of the main girder, the central pylon and stay-cables also in the serviceability limit state. Calculations results prove that the bridge's static force performance meets the specification requirements both in the construction and service status. So it can provide a reference for the design scheme selection and calculation analysis of similar bridges.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信